Laserfiche WebLink
<br />Dysprosium Street Project 2009 Chronology <br /> <br />2-17-09 PW Staff directed to prepare feasibility study for Dysprosium Street as the result of a <br /> PW committee that the road be closed at 142nd and Argon for a period of one year. <br /> A plan for Dysprosium should indentify conditions to make the neighborhood safer <br /> in the hopes that 142nd could be reopened. <br />4-21-09 PW Staff discussed the scope of Dysprosium Street improvements to be considered. <br />8-19-09 PW Details of the street improvements were discussed and direction was sought on <br /> the scope of the assessments that were desired. <br />11-10-09 FC Discussed CIP projects for 2010, Dysprosium Street was included as a 2010 project. <br />12-08-09 CCWS Council provided direction on assessment policy for the project. <br />