My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 01/19/2010
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2010 - 2019
>
2010
>
Agenda - Public Works Committee - 01/19/2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 9:55:03 AM
Creation date
1/14/2010 3:59:13 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
01/19/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Case #1: Driveway at 17811 Erkium Street <br />Assistant City Engineer Jankowski reviewed the staff report. <br />Mary Hjelm, 17811 Erkium Street, stated she has had an issue with this since 2001 when the <br />overlay was put down. She stated Mr. Jankowski had looked at the overlay in the past and said it <br />was fine. She noted last December 28 when she went out to get her paper, she fell on the part of <br />the raised road, which is higher than her driveway and broke three bones in her ankle. She stated <br />she thought the overlay would have been sloped into a gradual transition. <br />Assistant City Engineer Jankowski stated when the road was constructed in 1980, for some <br />reason the contractor pushed the bituminous out approximately 2 feet beyond the edge of the <br />driveways in that area. <br />Chairperson Elvig asked what Ms. Hjelm was looking for. <br />Ms. Hjelm stated she did not know if there was a solution. She indicated she did not have any <br />money to redo her driveway. She stated her biggest concern was if the City did another overlay <br />and if the same thing was done, it would make her driveway worse: She stated she would like to <br />have the overlay into a nice gradual transition into her driveway. She indicates she did not want <br />patchwork done. <br />Councilmember Dehen stated he had the same issue on his road and when the road was jacked <br />up, it caused the water to flow toward the homes. He asked if it would be okay with Ms. Hjelm <br />if the City put in a curb there. <br />Ms. Hjelm stated it was not an issue with standing water and the area drained fine. Her issue <br />was when that part froze. She noted she did not fall in her driveway, but on the road. <br />Councilmember McGlone stated in the City there were a lot of roadways constructed with <br />bituminous curb and where those driveways meet the curb, there were edges. He indicated this <br />was throughout the entire City. <br />Assistant City Engineer Jankowski noted there was a fairly even grade between the road and Ms. <br />Hjelm's driveway right now. He indicated there were three different distinct ages of pavement, <br />but they blended well together. <br />Chairperson Elvig did not know what the City could do about this issue. He noted he was <br />concerned about setting precedence also. <br />Ms. Hjelm stated she had done a visual of all of the houses in the development and there was not <br />one home that had her same issue. She stated there were possibly six homes that could have <br />some problems. She stated if this was everyone in the neighborhood, she would not have an <br />issue, but it was not everyone. <br />Public Works Committee /November 17, 2009 <br />Page 2 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.