Laserfiche WebLink
COMPLETED <br />Park Components <br />Existing Plan <br /> Site Items included: <br />$104,525 <br /> 1. 5% Mobilization <br />$269,347 <br /> 2. Grading <br />$93,454 <br /> 3. Overlooks A,B,C <br />$740,302 <br /> 4. Concrete walls, piping, splitters <br />Rhinestone Park parking lot <br />$151,233 <br /> 6. Irrigation <br />$222,074 <br /> 7. Pond Liner <br />(porous paving) <br />$127,322 <br /> 8. Walks, steps, pads <br /> (Parking lot with porous paving) <br />2005$227,525 <br />$164,412 <br /> 9. Lighting <br />2010$269,740 <br />$68,684 <br /> 10. Grass & Groundcover <br />Grant Components <br />Total <br />$179,680 <br /> 11. Trees, shrubs, perennials <br />$71,200 <br /> 12. Site furnishings <br /> (Amphitheater, Bridge, Trails) <br />2005$364,000 <br />2005$2,783,758 <br />$2,192,233 <br /> Subtotal 20052010$455,000 <br />2010$3,465,030 <br />$2,740,290 <br /> Subtotal 2010 <br />East Meandering Commons <br />Existing Plan <br />DRAFT FOR REVIEW <br />January 2010 <br />