Laserfiche WebLink
<br />CASE #: ~• D3 <br />REQUEST FOR FINAL PLAT REVIEW OF ELMCREST SANCTUARY LOCATED AT <br />16601 QUICKSILVER ST NW; <br />CASE OF OAKWOOD LAND DEVELOPMENT, INC. <br />By: Tim Gladhill, Associate Planner <br />Background: <br />Oakwood Land Development, Inc. submitted a sketch plan to develop a one (1) lot, two (2) outlot <br />single-family plat on the property generally located on the west of Saint Francis Blvd NW (TH <br />47) and south of 167' Ave NW. <br />Notification: <br />No public hearing is required for a minor plat. However, the City Council adopted a policy <br />requiring notification of a proposed subdivision be sent out to residents within 350 feet of the <br />subject property during sketch plan submittal. <br />Observations: <br />The Subject Property is approximately 25.6 acres in size and is zoned R-1 Residential (Rural <br />Developing). The land use designation is not proposed to change with the draft Comprehensive <br />Plan Update. The permitted density in the R-1 Residential (Rural Developing) District is one (1) <br />unit per two and a half (2.5) acres. .The sketch plan proposes one existing unit on a two and a <br />half (2.5) acre lot. This equates to a density of one (1) unit per two and a half (2.5) acres, which <br />meets City Code standards. <br />The development will receive access from Quicksilver Street. While the existing terminus. of <br />Quicksilver Street is a dedicated, public street, the future right-of--way owned by the City that <br />will serve as the frontage for the existing lot is not platted, nor dedicated public roadway at this <br />time, essentially creating aland-locked parcel. A temporary road easement will be required to be <br />restated along the existing access road to Elmcrest Park. In addition, an easement for a future <br />sidewalk along the eastern boundary shall be required. <br />It appears that all setbacks are met based on the Final Plat. A grading and drainage plan has been <br />submitted and found acceptable. The Final Plat includes sufficient drainage and utility <br />easements. Staff recommends that the Traffic Generation Analysis requirement be waived, as no <br />additional buildable lots are being created. <br />The existing lot is currently served by private well and septic. The Sketch Plan needs to be <br />revised to show the .location of these services. The existing septic system is currently located <br />partially on the adjacent parcel to the east, owned by the City for future right-of--way. This septic <br />system will need to be re-located to be fully on Lot 1, Block 1 or the existing agreement re-stated <br />and recorded against the Subject Property, notifying any future owners that the septic system <br />