Laserfiche WebLink
<br />Summary of Dysprosium Street Options <br /> <br />Full Reconstruction. $673,000 <br /> <br />. Narrowed street width with 12 foot travel lanes a parking lane on the west side <br />. Improved drainage <br />. Sidewalks both sides of street <br />. Chokers to reduce speed, increase pedestrian safety, improve aesthetics <br />. Streets lighting and boulevard trees <br /> <br />Full Depth Mill & Overlay - $607,000 <br /> <br />. Retain existing curblines <br />. Reclaim entire bituminous layer and replace with new bituminous <br />· Improved drainage <br />· Sidewalk on west side of street <br />. Streets lighting and boulevard trees <br /> <br />Edge Mill Overlay - $396,000 <br />. Retain existing curblines <br />. Mill six feet from each curbline <br />. Overlay with 1.5 inches of bituminous <br />. Improved drainage <br />. Sidewalk on west side of street <br />· No Streets lighting or boulevard trees (add $63,000 to include) <br /> <br />Edge Mill with no Sidewalk - $190,000 <br />. Retain existing curblines <br />· Mill six feet from each curbline <br />. Overlay with 1.5 inches of bituminous <br />· Improved drainage <br />. No Streets lighting or boulevard trees (add $63,000 to include) <br />