My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council Work Session - 02/09/2010
Ramsey
>
Public
>
Agendas
>
Council Work Session
>
2010
>
Agenda - Council Work Session - 02/09/2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2025 2:31:04 PM
Creation date
2/4/2010 11:06:41 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council Work Session
Document Date
02/09/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />DATED October 27, 2009 <br /> <br />MEMORANDUM OF UNDERSTANDING <br />FOR THE RECONSTRUCTION OF COUNTY STATE AID HIGHWAY 116 (BUNKER LAKE <br />BOULEVARD) <br />FROM GERMANIUM TO BASALT STREETS IN THE CITY OF RAMSEY <br />(SP 02-716-11) <br /> <br />This is a Memorandum of Understanding (MOU) between the County of Anoka, State of Minnesota, a <br />political subdivision of the State of Minnesota, 2100 Third Avenue North, Anoka, Minnesota, 55303, <br />hereinafter referred to as "County", and the City of Ramsey, a municipal corporation under the laws of <br />the State of Minnesota, 7550 Sunwood Drive NW, Ramsey, Minnesota, hereinafter referred to as the <br />"City". <br /> <br />The parties to this MOU agree in principle that constmction of County State Aid Project No. 02-716-11 <br />collectively referred to as the "Proj ect" is in the best interest of the traveling public and that the <br />Preliminary Layout as shown in Exhibit "A" defines the preliminary design of the Project. <br /> <br />It is agreed that the Exhibit "A" Layout dated October 27,2009 has been reviewed and accepted by the <br />parties and is suitable for preparation of final constmction documents. Any significant changes made <br />hereafter to the design as presented in the Exhibit "A" Layout will require approval by the parties as an <br />amendment to this MOU or addressed in a separate Joint Powers Agreement (JP A) that will formalize <br />this MOD. These same changes will require a change in the cost share to include any additional design <br />engineering cost that may occur. <br /> <br />IMPROVEMENTS: <br /> <br />It is agreed by the parties that in 2011 CSAH 116 will be reconstmcted to a 4-lane section with concrete <br />median to the extent shown in "Exhibit A". Improvements include but are not limited to: traffic signals, <br />right and left turn lanes, thm lanes, curb & gutter, storm sewer with associated ponding, bituminous trail <br />and potential noisewalls upon the findings of the noise study. <br /> <br />INTERSECTIONS: <br /> <br />As agreed by the parties, improvements to the following intersections have been incorporated in the <br />Exhibit "A" Layout design: <br /> <br />CSAH 116/ Basalt: Full Access with this project (subject to change in future projects) <br />CSAH 116/ Azurite Street NW: Full Access with this project (will be Right In / Right Out in future). <br />CSAH 116/ CSAH 57: Full Access Intersection with Traffic Signal <br />CSAH 116/ Wolfram Street NW: Right In / Right Out. <br />CSAH 116 / Unity Street NW: Right In / Right Out. <br />CSAH 116 / Tungsten Street NW: Right In / Right Out. <br />CSAH 116/ Magnesium Street NW, Full Access. (Under ground work for signal can be placed with this <br />proj ect.) <br />CSAH 116 / Krypton Street NW: Right In / Right Out <br />CSAH 116/ Iodine Street NW: Right In/ Right Out (To be closed if Magnesium Street is signalized in <br />the future, or crash issues arise). <br />CSAH 116/ Germanium Street NW: Right In / Right Out <br />
The URL can be used to link to this page
Your browser does not support the video tag.