Laserfiche WebLink
<br />TRAFFIC SIGNAL: <br /> <br />The parties agree that a traffic signal system at the CSAH 116 and CSAH 57 intersection will be <br />constmcted with this project. <br /> <br />CSAH 116 and CSAH 57 Signal System: <br /> <br />The parties agree that the cost of the constmction of this signal will be paid for by federal dollars with <br />100% of the local match to be paid by the City. Following the constmction, the ongoing traffic signal <br />maintenance of the CSAH 116 and CSAH 57 signal system will be consistent with Anoka County <br />warranted traffic signal maintenance practices, with the County 100% responsible for all ongoing traffic <br />signal maintenance, the City reimbursing the County 100% for all ongoing EVP maintenance (billed <br />quarterly on an ongoing basis), the City 100% responsible for allluminaire maintenance, and the City <br />100% responsible for the ongoing supply of electrical power for the traffic signal system. <br /> <br />RIGHT OF WAY: <br /> <br />The parties agree that the County will acquire all necessary right-of-way and easements for the Project. <br />Acquisition of any additional right-of-way and/or easements needed for improvements to the City street <br />intersections beyond what is defined in the Exhibit "A" Layout will be the responsibility of the City. It <br />is agreed by the paliies that all necessary right of way and easements will be in legal possession of the <br />County prior to acceptance of bids for the proj ect. Any City owned property or easements required for <br />the constmction will be conveyed to the County at no cost. <br /> <br />DRAINAGE: <br /> <br />The City shall pay for a percentage of the cost of the storm sewer system, including the detention basins <br />and their outlet stmctures, pending the availability of Federal funding. The City portion of the cost is <br />based on contributing flow through the storm sewer system to the detention basin determined by the <br />product of contributing area and n1l10ff coefficient. The patiies understand and agree that the <br />maintenance of the completed storm sewer system (excluding catch basins and catch basin leads), <br />detention basins, and their outlet stmctures shall be the sole responsibility of the City. <br /> <br />ENVIRONMENTAL ISSUES: <br /> <br />A noise analysis is being performed as part of the Environmental Documentation process. If noise walls <br />are required, the standard county cost share will apply, the county pays 100% for the noise walls in areas <br />where the city has not been previously notified and the city pays 100% in the areas where they have <br />been previously notified of potential noise walls. In addition, the city pays for any costs above the base <br />cost of the noise wall. <br />