Laserfiche WebLink
Staff will be present at time of the summary for explanation of bullet points below and for <br />questions. <br />✓ Clean sanitary sewer with jetter <br />✓ Attach proofer to show mains are clear <br />✓ Inspections of manholes for issues <br />✓ Televising sewer mains <br />✓ Root removal in areas found to have tree root infiltration <br />✓ Identify problem areas /components for future repairs <br />✓ Documentation of all activities <br />And for the City's seven lift stations a maintenance schedule that will include: <br />✓ Easy availability of original service manuals for each site <br />✓ Operating procedures for manipulating pump operations (manual or automatic) <br />✓ Cleaning wet wells <br />✓ Regular rotation and testing of lead and lag pumps <br />✓ Regular inspections and cleaning <br />✓ Regular inspections of SCADA, alarm systems and electrical equipment <br />✓ Monthly Generator inspections and hookups for backup generator <br />✓ Maintenance records for each site <br />✓ Clean force mains <br />✓ Identify problem areas for repairs <br />Committee Action: <br />For informational purposes only <br />Reviewed by: <br />Director of Public Works /Principal City Engineer <br />City Engineer <br />PW: 02/16/10 <br />