My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council Work Session - 02/23/2010
Ramsey
>
Public
>
Agendas
>
Council Work Session
>
2010
>
Agenda - Council Work Session - 02/23/2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2025 2:31:57 PM
Creation date
2/18/2010 4:08:56 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council Work Session
Document Date
02/23/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TRAFFIC SIGNAL: <br />The parties agree that a traffic signal system at the CSAH 116 and CSAH 57 intersection will be <br />constructed with this project. <br />CSAH 116 and CSAH 57 Si ng al S sy tem: <br />The parties agree that the cost of the construction of this signal will be paid for by federal dollars with <br />100% of the local match to be paid by the City. Following the construction, the ongoing traffic signal <br />maintenance of the CSAH 116 and CSAH 57 signal system will `be consistent with Anoka County <br />warranted traffic signal maintenance practices, with the County 1 Ofl% responsible for all ongoing traffic <br />signal maintenance, the City reimbursing the County 100% for all ongoing EVP maintenance (billed <br />quarterly on an ongoing basis), the City 100% responsible for all luminaire maintenance, and the City <br />100% responsible for the ongoing supply of electrical power for the traffic signal system. <br />RIGHT OF WAY: <br />The parties agree that the County will acquire all necessary right-of--way and easements for the Project. <br />Acquisition of any additional right-of--way.. and/or easements needed for improvements to the City street <br />intersections beyond what is defined in the Exhibit"A" Layout will be the responsibility of the City. It <br />is agreed by the parties that all necessary right of way and easements will be in legal possession of the <br />County prior to acceptance of bids for the project., Any City owned property or easements required for <br />the construction will be conveyed to the County at no :cost: <br />DRAINAGE: <br />The City shall pay for a percentage of the cost of the storm sewer system, including the detention basins <br />and their outlet structures, pending the availability of Federal funding. The City portion of the cost is <br />based on contributing flow through the storm sewer system to the detention basin determined by the <br />product of contributing area and runoff coefficient. The parties understand and agree that the <br />maintenance of the completed storm sewer system (excluding catch basins and catch basin leads), <br />detention basins, and their outlet structures shall be the sole responsibility of the City. <br />ENVHtONMENTAL ISSUES: <br />A noise analysis is being performed as part of the Environmental Documentation process. If noise walls <br />are required, the standard county cost share will apply, the county pays 100% for the noise walls in areas <br />where the city has not been previously notified and the city pays 100% in the areas where they have <br />been previously notified of potential noise walls. In addition, the city pays for any costs above the base <br />cost of the noise wall. The project federal fund percentage (determined by dividing total cost of <br />federally eligible items by federal dollars available) will be applied to the cost of warranted noise walls. <br />
The URL can be used to link to this page
Your browser does not support the video tag.