My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council Work Session - 02/23/2010
Ramsey
>
Public
>
Agendas
>
Council Work Session
>
2010
>
Agenda - Council Work Session - 02/23/2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2025 2:31:57 PM
Creation date
2/18/2010 4:08:56 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council Work Session
Document Date
02/23/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BITUMINOUS TRAIL: <br />The parties agree that the construction of the bituminous trail along the north side of the roadway is <br />eligible for federal funds and that the City will contribute all matching funds. This trail location has been <br />agreed to by the City. If this location changes in the future, the additional costs associated with this <br />change will be the responsibility of the City. The parties understand that the cost for the trail includes: <br />bituminous surfacing, aggregate base, excavation (including muck excavation), borrow material <br />(granular and topsoil), and turf establishment. The parties agree Ghat the County will pay for the design <br />of the trail, wetland mitigation required by impacts caused by the trail, the additional right of way and <br />easements required to construct the trail at the proper location, and any removal items, with the <br />exception of soils, required to construct the trail. The parties understand and agree that all future <br />maintenance of the trails, including snow plowing, shall be the sole responsibility of the City. <br />The trail along the north side of CSAH 116 is part of the County Regional Trail System and is eligible <br />for potential funding through the Metropolitan Council's Regional Parks Capital Improvement Program. <br />After the project has been constructed, and a request has been made by the City, the Anoka County <br />Parks and Recreation Department will seek reimbursement for one-half of the City's share for trail <br />construction along CSAH 116. If funds are secured, the_Anoka County Parks and Recreation <br />Department will reimburse the City with the additional funds received, <br />TRAFFIC CONTROL: <br />The parties understand .and agree that CSAH 116 from Tungsten to Magnesium streets will be closed to <br />thru traffic during construction for a period of time, but will always be open residences located in the <br />closure who have no alternative route to their home. This closure will be minimized based on the <br />construction of this segment of CSAH 116 due to deep muck excavation and potential surcharge (to be <br />determined during the design process). The parties agree and understand the cost share for traffic <br />control, pending Federal funding for the city shall be a prorated share based on the city project cost <br />divided by the total project cost. It is understood that Anoka County will use best management practices <br />to limit the amount of time that this segment of roadway is closed. <br />DRNEWAYS: <br />The parties agree that all driveways affected by the Project will be reconstructed in kind with the cost of <br />any upgrades requested by the City, including concrete aprons, to be the responsibility of the City. <br />LANDSCAPING/STREETSCAPING: <br />The parties agree that if the City wishes to include landscaping or streetscape features in the project, <br />they shall be designed in accordance with Anoka County Highway Department Landscape/Streetscape <br />
The URL can be used to link to this page
Your browser does not support the video tag.