Laserfiche WebLink
Exhibit Cost Est 02- 02- 2010.x1s 2/3/2010 9:53 AM <br />EXHIBIT "A " = Project Layout <br />EXHIBIT "B" = Estimated Cost Share EXHIBIT "B" 30% ENGINEER'S ESTIMATE OF PROBABLE CONSTRUCTION COSTS <br />EXHIBIT "C"= eringAgreement <br />by MAR 10 02 -02 -2010 2- 2010 02 -02 -2010 CSAH 116 (BUNKER LAKE BLVD) AND INTERSECTION CSAH 57 (SUNFISH LAKE BLVD) <br />PARTICIPATING FEDERAL FUNDS <br />PROJECT TOTAL STORM SEWER <br />UNIT ANOKA COUNTY (A) CITY OF RAMSEY (B) City of RAMSEY (C) CITY OF ANOKA (D) CITY of RAMSEY (E) 73.5% CITY of ANOKA (F) <br />NUMBER ITEM UNIT PRICE SP 02- 716 -11 MSAP XX -XXX -XXX CSAH 57 MSP XX- XXX -XXX MSP XX- XXX -XXX COUNTY, 26.5% CITY 98.2% COUNTY, 1.8% CITY <br />QUANTITY AMOUNT QUANTITY AMOUNT QUANTITY AMOUNT QUANTITY AMOUNT QUANTITY AMOUNT QUANTITY AMOUNT QUANTITY AMOUNT <br />2503.511 <br />6" PVC PIPE SEWER <br />LIN FT <br />$18.00 <br />2503.541 <br />15" RC PIPE SEWER DES 3006 <br />LIN FT <br />$25.00 <br />4583 <br />$114,575.00 <br />4583 <br />$114,575 <br />2503.541 <br />18" RC PIPE SEWER DES 3006 <br />LIN FT <br />$26.00 <br />719 <br />$18,694.00 <br />719 <br />$18,694 <br />2503.541 <br />21" RC PIPE SEWER DES 3006 <br />LIN FT <br />$27.00 <br />1000 <br />$27,000.00 <br />1000 <br />$27,000 <br />2503.541 <br />24" RC PIPE SEWER DES 3006 <br />LIN FT <br />$28.00 <br />819 <br />$22,932.00 <br />819 <br />$22,932 <br />2503.541 <br />27" RC PIPE SEWER DES 3006 <br />LIN FT <br />$29.00 <br />2093 <br />$60,697.00 <br />2093 <br />$60,697 <br />2503.541 <br />30" RC PIPE SEWER DES 3006 <br />LIN FT <br />$30.00 <br />306 <br />$9,180.00 <br />306 <br />$9,180 <br />2503.541 <br />33" RC PIPE SEWER DES 3006 <br />LIN FT <br />$26.00 <br />818 <br />$21,268.00 <br />818 <br />$21,268 <br />2501.515 <br />15" RC PIPE APRON <br />EACH <br />$600.00 <br />4 <br />$2,400.00 <br />4 <br />$2,400 <br />2501.515 <br />30" RC PIPE APRON <br />EACH <br />$800.00 <br />1 <br />$800.00 <br />1 <br />$800 <br />2501.515 <br />33" RC PIPE APRON <br />EACH <br />$1,000.00 <br />1 <br />$1,000.00 <br />1 <br />$1,000 <br />2503.602 <br />CONNECT TO EXISTING MANHOLES (SAN) <br />EACH <br />$26.00 <br />2503.602 <br />CONNECT TO EXISTING STORM SEWER <br />EACH <br />$750.00 <br />1 <br />$750.00 <br />1 <br />$750 <br />2504.602 <br />ADJUST HYDRANT <br />EACH <br />$850.00 <br />2 <br />$1,700.00 <br />2 <br />$1,700.00 <br />CONST DRAINAGE STRUCTURE (W /CASTING) <br />LUMP SUM <br />$3,250.00 <br />2506.522 <br />ADJUST FRAME & RING CASTING <br />EACH <br />$500.00 <br />4 <br />$2,000.00 <br />4 <br />$2,000.00 <br />2521.501 <br />4" CONCRETE WALK <br />SO FT <br />$3.00 <br />70840 <br />$212,520.00 <br />59049 <br />$177,147.00 <br />11791 <br />$35,373 <br />2521.501 <br />6" CONCRETE WALK <br />SO FT <br />$4.50 <br />2531.501 <br />CONCRETE CURB & GUTTER DESIGN B418 <br />LIN FT <br />$10.00 <br />15812 <br />$158,120.00 <br />12796 <br />$127,960.00 <br />3016 <br />$30,160 <br />2531.501 <br />CONCRETE CURB & GUTTER DESIGN B424 <br />LIN FT <br />$11.00 <br />15432 <br />$169,752.00 <br />6576 <br />$72,336.00 <br />3321 <br />$36,531.00 <br />2280 <br />$25,080 <br />3255 <br />$35,805.00 <br />2531.501 <br />CONCRETE CURB & GUTTER DESIGN B612 <br />LIN FT <br />$12.00 <br />201 <br />$2,412.00 <br />170 <br />$2,040.00 <br />31 <br />$372 <br />2531.501 <br />CONCRETE CURB & GUTTER DESIGN B618 <br />LIN FT <br />$13.00 <br />2531.507 <br />6" CONCRETE DRIVEWAY PAVEMENT <br />SQ YD <br />$40.00 <br />2531.618 <br />TRUNCATED DOMES <br />SO FT <br />$25.00 <br />190 <br />$4,750.00 <br />117 <br />$2,925.00 <br />73 <br />$1,825 <br />2563.601 <br />TRAFFIC CONTROL <br />LUMP SUM <br />$ 40,000 <br />1 <br />$40,000.00 <br />0.633 <br />$25,320.00 <br />0.049 <br />$1.960.00 <br />0.163 <br />$6,520.00 <br />0.008 <br />$320.00 <br />0.059 <br />$2.360.00 <br />2564.531 <br />SIGN PANELS TYPE C <br />SO FT <br />2564.537 <br />INSTALL SIGN TYPE SPECIAL <br />EACH <br />2565.511 <br />TRAFFIC CONTROL SIGNAL SYSTEM <br />SIG SYS <br />$250,000 <br />1 <br />$250,000.00 <br />1 <br />$250,000 <br />2565.601 <br />EMERGENCY VEHICLE PREEMPTION SYSTEM <br />LUMP SUM <br />$ 10,000.00 <br />1 <br />$10,000.00 <br />1 <br />$10,000 <br />2565.602 <br />PVC HANDHOLE (METAL FRAME WITH COVER) <br />EACH <br />1 <br />1 <br />2565.602 <br />NMC LOOP DECETOR 6'X 6' <br />EACH <br />2565.603 <br />2 -INCH RIGID STEEL CONDUIT - INTERCONNECT <br />LIN FT <br />2571.501 <br />CONIFEROUS TREE 3' HT CONT <br />TREE <br />2571.505 <br />DECIDUOUS SHRUB NO 5 CONT <br />SHRUB <br />2571.507 <br />PERENNIAL NO 1 CONT <br />PLANT <br />2573.502 <br />SILT FENCE, TYPE MACHINE SLICED <br />LIN FT <br />$2.00 <br />16599 <br />$33,198.00 <br />14592 <br />2007 <br />$4,014 <br />2573.505 <br />FLOTATOIN SILT CURTAIN <br />LIN FT <br />$15.00 <br />977 <br />$14,655.00 <br />977 <br />2573.530 <br />STORM DRAIN INLET PROTECTION <br />EACH <br />$150.00 <br />152 <br />$22,800.00 <br />152 <br />2573.550 <br />EROSION CONTROL SUPERVISOR <br />LUMP SUM <br />$3,000.00 <br />1 <br />$3,000.00 <br />1 <br />2575.501 <br />SEEDING <br />ACRE <br />$200.00 <br />3.46 <br />$692.00 <br />3.3 <br />0.16 <br />$32 <br />2575.502 <br />SEED MIXTURE 310 <br />POUND <br />$15.00 <br />76 <br />$1,140.00 <br />76 <br />2575.502 <br />SEED MIXTURE 350 <br />POUND <br />$5.00 <br />215 <br />$1,075.00 <br />201 <br />14 <br />$70 <br />2575.505 <br />SODDING TYPE SALT RESISTANT <br />SO YD <br />$3.00 <br />18408 <br />$55,224.00 <br />15078 <br />3330 <br />$9,990 <br />2575.513 <br />MULCH MATERIAL TYPE 1 <br />TON <br />$210.00 <br />7 <br />$1,470.00 <br />6.6 <br />0.4 <br />$84 <br />2575.523 <br />EROSION CONTROL BLANKETS CATEGORY 3 <br />SO YD <br />$2.00 <br />12846 <br />$25,692.00 <br />11993 <br />853 <br />$1,706 <br />2581.501 <br />REMOVABLE PREFORMED PLASTIC MARKING <br />LIN FT <br />2581.602 <br />PAVEMENT MESSAGE (LT ARROW) PREFORMED THERMOPLA <br />EACH <br />2581.602 <br />PAVEMENT MESSAGE (RT ARROW) PREFORMED THERMOPLA <br />EACH <br />2582.502 <br />4" SOLID LINE WHITE - PAINT <br />LIN FT <br />2582.502 <br />4" SOLID LINE YELLOW - PAINT <br />LIN FT <br />2582.502 <br />4" SOLID LINE WHITE - EPDXY <br />LIN FT <br />2582.502 <br />4" BROKEN LINE WHITE - EPDXY <br />LIN FT <br />2582.502 <br />4" SOLID LINE YELLOW - EPDXY <br />LIN FT <br />