Laserfiche WebLink
Exhibit Cost Est 02- 02- 2010.x1s 2/3/2010 <br />9:53 AM <br />EXHIBIT "A " = Project Layout <br />EXHIBIT "B" = Estimated Cost Share EXHIBIT "B" 30% ENGINEER'S ESTIMATE OF PROBABLE CONSTRUCTION COSTS <br />EXHIBIT "C"= eringAgreement <br />by MAR 10 02 -02 -2010 2- 2010 02 -02 -2010 CSAH 116 (BUNKER LAKE BLVD) AND INTERSECTION CSAH 57 (SUNFISH LAKE BLVD) <br />PARTICIPATING FEDERAL FUNDS <br />PROJECT TOTAL STORM SEWER <br />UNIT ANOKA COUNTY (A) CITY OF RAMSEY (B) City of RAMSEY (C) CITY OF ANOKA (D) CITY of RAMSEY (E) 73.5% CITY of ANOKA (F) <br />NUMBER ITEM UNIT PRICE SP 02- 716 -11 MSAP XX -XXX -XXX CSAH 57 MSP XX- XXX -XXX MSP XX- XXX -XXX COUNTY, 26.5% CITY 98.2% COUNTY, 1.8% CITY <br />QUANTITY AMOUNT QUANTITY AMOUNT QUANTITY AMOUNT QUANTITY AMOUNT QUANTITY AMOUNT QUANTITY AMOUNT QUANTITY AMOUNT <br />2582.502 <br />4" DOUBLE SOLID LINE YELLOW - EPDXY <br />LIN FT <br />STATE FUNDS <br />LOCALFUNDS <br />ANOKA COUNTY (COLUMN A + 73.5% COLUMN E+ 98.2% COLUMN F) <br />4,224,979.87 <br />2,580,203.69 <br />1,644,776.18 <br />CITY of RAMSEY (COLUMN B + 26.5% COLUMN E) <br />402,583.85 <br />245,858.76 <br />156,725.09 <br />CITY of RAMSEY (COLUMN C) CSAH 57 <br />1,352,216.40 <br />825,801.27 <br />2582.503 <br />ZEBRA CROSSWALK - WHITE PREFORMED THERMOPLASTIC <br />SO FT <br />47,382.00 <br />28,936.28 <br />18,445.72 <br />TOTAL <br />6,027,162.12 <br />3,680,800.00 <br />2,346,362.12 <br />2582.618 <br />24" STOP LINE WHITE - PREFORMED THERMOPLASTIC <br />SO FT <br />PERMANENT SIGNING <br />LUMP SUM <br />$70,000.00 <br />STORM DRAIN INLET PROTECTION <br />EACH <br />$500.00 <br />TURF ESTABLISHMENT (TEMP.) <br />ACRE <br />$1,000.00 <br />TURF ESTABLISHMENT (PERM.) <br />ACRE <br />$1,500.00 <br />PAVEMENT MARKINGS <br />LUMP SUM <br />$170,000 <br />SUBTOTAL <br />$5,206,164.50 <br />$3.295,586.10 <br />$254.281.00 <br />$1,126,847.00 <br />$39,485.00 <br />$306,436.00 <br />15 % CONTINGENCIES + 5% INFLATION <br />$1,004,527.02 <br />$659,117.22 <br />$50,856.20 <br />$225,369.40 <br />$7,897.00 <br />$61,287.20 <br />TOTAL <br />$6,027,162.12 <br />-- F$3,954,703.32 <br />$305,137.20 <br />$1,352,216.40 <br />$47,382.00 <br />$367,723.20 <br />PRORATA ITEM <br />TOTAL WITHOUT MOBILIZATION, FIELD OFFICE TYPE D. AND TRAFFIC CONTROL <br />RATIO OF COLUMN SUBTOTAL VS. PROJECT SUBTOTAL <br />(BOTH W/O MOBILIZATION, FIELD OFFICE, AND TRAFFIC CONTROL) <br />Funds: <br />Federal Fund $3,680,800.00 <br />Others Fund <br />A B <br />$4,746,164.50 $3;004,406.1`0 $231 <br />1.134 0.633 0.049 <br />NOTES: <br />(1) ESTIMATE DOES NOT INCLUDE LANDSCAPING, CITY UTILITIES, TURF ESTABLISHMENT, MUCK EXCAVATION, POND EXCAVATION. <br />(2) FEDERAL FUNDING = $3,680,800. FEDERAL % OF TOTAL COST = 61.07% Participating only. <br />(3) MATCH $ FUNDING = $920,000, % OF TOTAL COST = <br />(4) STORM SEWER ASSUMED TO BE 100% STATE AID ELIGIBLE. COUNTY /CITY COST SPLIT BASED ON COMPOSITE CxA INSIDE /OUTSIDE PROPOSED COUNTY RIGHT -OF -WAY. And = <br />G D E <br />$1,051,667.00 $35,805.00 $279,296.00 <br />0.222 <br />COST SHARE SUMMARY <br />AGENCY <br />TOTAL COST <br />FEDERALFUNDS <br />STATE FUNDS <br />LOCALFUNDS <br />ANOKA COUNTY (COLUMN A + 73.5% COLUMN E+ 98.2% COLUMN F) <br />4,224,979.87 <br />2,580,203.69 <br />1,644,776.18 <br />CITY of RAMSEY (COLUMN B + 26.5% COLUMN E) <br />402,583.85 <br />245,858.76 <br />156,725.09 <br />CITY of RAMSEY (COLUMN C) CSAH 57 <br />1,352,216.40 <br />825,801.27 <br />526,415.13 <br />CITY of ANOKA (COLUMN C + To be check % COLUMN E) <br />47,382.00 <br />28,936.28 <br />18,445.72 <br />TOTAL <br />6,027,162.12 <br />3,680,800.00 <br />2,346,362.12 <br />0.008 0.059 <br />City of Ramsey 26.5% City of Anoka 1.8% <br />F <br />Payble from City of Ramsey 2 +3= $683,140.22 <br />Payble from City of Anoka 4= $18,445.72 <br />