<br />TRAFFIC CONTROL: <br /> <br />The parties understand and agree that CSAH 116 from Tungsten to Magnesium streets will be closed to <br />thrugh traffic during construction for a period of time, but will always be open to residences located in <br />the closure who have no alternative route to their home. This closure will be minimized based on the <br />construction of this segment of CSAH 116 due to deep muck excavation and potential surcharge (to be <br />determined 'during the design process). The parties agree and understand the cost share for traffic <br />control, pending Federal funding shall be a prorated share based on the project cost divided by the total <br />project cost. It is understood that Anoka County will use best management practices to limit the amount <br />of time that this segment of roadway is closed. <br /> <br />DRlVEWAYS: <br /> <br /> <br />ed for removal) by the Project will <br />City, including concrete aprons, <br /> <br />The parties agree that all driveways affected ( excluding th <br />be reconstructed in kind with the cost of any upgrades re <br />to be the responsibility of the City. <br /> <br />LANDSCAPING/STREETSCAPING: <br /> <br />UTILITIES: <br /> <br />City will be res <br />be incorponr <br />will be th~ <br />to include' <br />documents m <br /> <br />clude specific proposed utility locations. The <br />er and water main improvements, which will <br />co , f the design and construction of these features <br />City's of the sanitary sewer and water main utilities are <br />. ons, estimated quantities and costs. All construction <br />October 31,2010. <br /> <br />If allowed by MnD City may choose to improve a small segment of Magnesium <br />Street north ofthe pro d cons.. n limits for this project. The City will be responsible for the <br />design of this improveme . hi,2~~in be incorporated into the project bid documents. The cost of the <br />design and construction oft111 "rovement will be the responsibility of the City. The City's design for <br />this work will include the signeplan sheets, specifications, estimated quantities, and costs. All <br />construction documents must be submitted to the County by October 31, 2010. <br /> <br />Any additional drainage contributions that arise due to this city requested extension shall be computed <br />into the drainage percentage that the city is responsible for. No federal dollars will be utilized for the <br />additional drainage contribution (if any) or roadway construction. <br />