Laserfiche WebLink
The parties agree that the County will secure all necessary permits for this Project. The City agrees to <br />coordinate with the County in securing the permits required by the Lower Rum River Watershed <br />District. <br />II. METHOD: <br />The County shall provide all engineering services and shall cause the construction of the Project in conformance <br />with said plans and specifications. The County shall do the calling for all bids and the acceptance of all bid <br />proposals. <br />III. COSTS: <br />A. The contract costs of the work, or the work is not contracted, the cost of all labor, <br />materials, normal engineering costs and equipment rental required to complete the work, shall constitute <br />the actual "construction costs" and shall be so referred:: to herein. "Estimated costs" are good faith <br />projections of the costs, which will be incurr for this project: Actual costs may vary and those will be <br />the costs for which the relevant parties will bei,responsible. <br />B. The estimated construction cost of the project (including County furnished materials) is <br />$6,027,162. Federal funds available for the Project are capped at $3,680;800.00 The federal funds shall <br />be split based on the ratiii3 of eligible cost incurred by each party to the total eligible project cost. <br />Eligible costs are the 6640.fif s that can participate in federal funding as shown on Exhibit A. <br />isx';as <br />Participation ♦: follows: <br />•i 'i^.. T <br />A lum p sum amount of 450,000 Will tie paid''by the City;of Ramsey to Anoka County for the <br />improvernents on CSAH 57i(Sunfis i Lake Blvd. which includes engineering and design but does not <br />not include noise walls, or the needed right of way to construct said walls.. This amount is per the <br />Ramsey Town Center Agreement, y'[he remaining work on CSAH 116 will be split per the County <br />standard cost share policy. The amounts below °are for CSAH 116 and are based on the standard Anoka <br />County cost share. <br />1. The City shall pay:their share of mobilization and equipment field office as determined using the <br />Engineer's Estimate. Th `estimated City cost of these items is $19,580 <br />2. The City shall pay their share of the Trail installation. The estimated cost of this item to the city <br />is $39,600 <br />3. The City shall pay their share of the drainage costs. The estimated City cost of this item is <br />$64,314, (66% of the city's share of 26.5 %, assumption is that 1/3 of city drainage cost is on <br />CSAH 57 and covered by lump sum stated above). Final percentage is based on State Aid <br />drainage letter. <br />4. The City shall pay their share of the cost of concrete curb, medians and sidewalks installed on the <br />project. The estimated cost to the City is $36,531. <br />