Laserfiche WebLink
5. The City shall pay its share of the cost of signals (cost covered in lump sum stated above). <br />6. The City shall pay its share of the cost noise walls. The estimated cost is $245,007. This cost is <br />before federal funds are applied. <br />The total estimated cost to the City for the project is summarized below: <br />1 Mobilization, Field Office <br />2 Bituminous removal and muck excavation <br />3 Drainage <br />4 Concrete curb, medians, and sidewalks <br />5 Signals <br />6 Noise walls <br />Lump sum as stated above for CSAH 57 work <br />Total Estimated Share of Construction Cost.To The City <br />Estimated Federal Funds available'; to the City <br />61.07 % estimated Federal participation * $365432 <br />( $815,432 - $450,00 lump sum) <br />Total Cost less Federal Funds <br />Of this $592,263, $450,000 is a lump sum payment for.,CS <br />share for improvements on CSAH 116 and noisewalls on <br />The total estimated construction cost to tle`;City (less Federal Funds) for the project is $592,263 as shown on the <br />attached Exhibit B. The City articipation�:in construction; engineering will be at a rate of eight percent (8 %) of <br />their designated share of $365,4S24 The'estnnated cost tosthe City for construction engineering is $29,234The <br />grand total estimated`cost to the City for the" project is $621,497 <br />Upon award of ,the contract, the City shall pay to the County, upon written demand by the County, ninety five <br />percent (95 %)' o£. fts portion of the cost of the project estimated at $590,422. The City's share of the cost of the <br />project shall include:, only construction; and construction engineering expense and does not include administrative <br />expenses incurred bythe County. <br />Upon final completion ofthe project, ;the City's share of the construction cost will be based upon actual <br />construction costs. If necessary, adjusttnents to the initial ninety five percent (95 %) charged will be made in the <br />form of credit or additional charges to,the City's share. Also, the remaining five percent (5 %) of the City's portion <br />of the construction costs shall be'paid. The County will bill the 95% based on actual numbers received from low <br />bidder. <br />$19,580 <br />$0 <br />$64,314 <br />$36,531 <br />$ 0 covered <br />in lump sum <br />$245,007 <br />$450,000 <br />$81, <br />$223',1:69 <br />$592,263 <br />his leaves $142,263 in city cost <br />57 and, CSAH 116. <br />IV. TERM <br />This Agreement shall continue until terminated as provided hereinafter. <br />V. DISBURSEMENT OF FUNDS <br />All funds disbursed by the County or City pursuant to this Agreement shall be disbursed by each entity pursuant <br />to the method provided by law. <br />