My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 01/13/1981
Ramsey
>
Public
>
Agendas
>
Council
>
1981
>
Agenda - Council - 01/13/1981
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2025 1:36:02 PM
Creation date
3/8/2010 10:17:08 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
01/13/1981
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
254
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />. . <br /> <br />- 22 - <br /> <br />c. A total of 388 ~cres of land for a landfill for the Metro <br />Plant ash would be needed if the total incineration mode of <br />disposal is followed. If marketing of heat-dried, secondary <br />sludge on private land is followed, then 25,000 acres will <br />be needed for the heat-dried sludge and 226 acres for an ash <br />landfill. <br /> <br />D. 51 acres of land for landfilling of the Seneca plant ash <br />would be required if total incineration is followed. If <br />land application on private farmlands for six months is <br />followed, 32 acres would be required for a landfill and 650 <br />acres for landspreading. <br /> <br />E. <br /> <br />220 acres of land for land application of sludge from the <br />Empire Plant is needed. The MWCC currently owns this land, <br />if this land is to continued to be used, the Council must <br />selected it as one of the final sludge disposal sites. If <br />another site needs to be chosen only 110 acres would be MWCC <br />owned land and 110 acres private farmland. <br /> <br />. <br /> <br />F. Sludge processing facilities should be built at the Blue <br />Lake plant. About 1350 acres of land is needed for land <br />application of sludge: of this, 600 acres would be on <br />private farms and about 750 would be on MWCC-owned land. If <br />the land the MWCC currently owns is to continue to be used, <br />the Council must select it as one of the final sludge <br />dispo sal site s. <br /> <br />G. <br /> <br />For the Stillwater, Bayport, Anoka~ Rosemount, Cottage Grove <br />and Hastings plants, the MWCC should pursue land application <br />of digested sludge on private fa~mland. If this option <br />cannot be implemented the sludge will be hauled to the Metro <br />plant for processing and disposal. The sludge from Maple <br />Plain, Chaska and Savage should be hauled to Blue Lake for <br />processing and disposal. <br /> <br />. <br /> <br />H. Scree'nings and gritshouxd betaken to commercial landfills <br />until it becomes cost-effective for the MWCC to put this <br />material in their own facility. <br /> <br />I. Metro Plant ash may be considered a hazardous waste once the <br />current construction program is completed. <br /> <br />J. A potential market for the reCYCling and reuse of sludge, <br />ash and grit exists in the Twin Cities area. <br /> <br />8. RECOMMENQATIONS <br /> <br />A. The MWCC should pursue marketing of heat-dried secondary <br />sludge from the Metro Plant and continue to incinerate the <br />primary sludge. <br /> <br />B. The MWCC should continue total incineration of sludge from <br />the Seneca Plant in the immediate future. However, as the <br />MWCC's gains expertise" in landspreading it should pursu.e <br />land application of all stabilized sludge for six months a <br />year. <br />
The URL can be used to link to this page
Your browser does not support the video tag.