Laserfiche WebLink
<br /> <br />LOCATION <br /> <br />Beach, ND <br /> <br />. <br /> <br />Casselton, ND <br /> <br />... <br /> <br />. <br /> <br />Elk River, MN <br /> <br /> <br />STATUS OF DEMONSTRATION PROJECTS <br /> <br />PROPOSED WORK <br /> <br />. Install GCPs* and <br />gates at crossings <br /> <br />. Modify sidings both <br />east and west of <br />the City. <br /> <br />. Install power switch <br /> <br />. Install GCPs and <br />gates at crossings; <br />close one crossing; <br />construct a pedestrian <br />crossing <br /> <br />. Institute safety <br />education program <br />in schools. <br /> <br />. Install GCPs at <br />crossings <br /> <br />. Improve intersection <br /> <br />= grade crossing ~redictors <br /> <br /> <br />STATUS <br /> <br />Scheduled for <br />completion by <br />December <br /> <br />One area siding <br />has been length- <br />ened. <br /> <br />Deferred by BN <br />because of <br />economic down- <br />turns <br /> <br />Crossing has been <br />closed by order of <br />the state Public <br />Service Commission <br />but the order has <br />been appealed by <br />Casselton. Other <br />crossings improve- <br />ments, scheduled <br />for completion by <br />January, have <br />been held in <br />obeyance until <br />the closing issue <br />is resolved. <br /> <br />Has been <br />instituted. <br /> <br />Final agreements <br />being prepared; <br />installation by <br />next spring. <br /> <br />Further evaluation <br />of improvements <br />being conducted <br /> <br /> <br />RAIL STUDY NEWSLETTER P. 2 <br />