My WebLink
|
Help
|
About
|
Sign Out
Home
Minutes from 1991
Ramsey
>
Public
>
Dissolved Boards/Commissions/Committees
>
LRRWMO
>
Minutes
>
Minutes from 1991
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/21/2025 1:31:00 PM
Creation date
4/14/2010 9:00:51 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Minutes
Document Title
Lower Rum River Water Management Organization
Document Date
12/19/1991
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
LRRWMO Meeting Minutes <br />January 23, 1991 <br />Page 5 <br />Erickson noted this temporary road will result in increased <br />velocity, and expressed the hope the proper calculations were <br />made. Schultz noted the importance of handling this project <br />properly in that the City of Anoka recently installed <br />electric cable just east and downstream of this project. <br />Weaver added there are two navigable channels in that part of <br />the river. If those responsible do not remove the material, <br />they remove the ability to safely navigate that part of the <br />river. <br />Weaver and Schrantz concurred the following comments to this <br />proposed project amendment be sent to Tom Hovey, Area <br />Hydrologist with the Department of Natural Resources, under <br />Chairman Schrantz's signature: <br />1. The fill should be removed by March 15, 1991. <br />2. Those responsible should be sure the bottom of the river <br />is returned as near as possible to its original contours. <br />3. Proper protection and care should be given the City of <br />Anoka's newly buried electrical cable, located three feet <br />deep east, downstream, of the bridge. Additional care should <br />be afforded the abandoned electrical cable located within the <br />proposed temporary bridge area, in that oils are inside those <br />cables. <br />4. This project will create increased velocity by narrowing <br />the riverbed. Added velocity of the water will have a <br />tendency to erode the embankment, scouring the bottom, and <br />have the possibility of creating a delta downstream. <br />Schrantz and Weaver expressed their frustration in that this <br />board is not adequately being kept informed of upcoming <br />projects in order to allow us to review and comment properly. <br />The LRRWMO was given statutory designated responsibilities to <br />assure the rivers are not in any way subjected to deteriora- <br />tion of water quality. We must, therefore, be notified of <br />any process that does endanger the quality of water in the <br />Mississippi River as the result of this project. <br />PENDING PROJECTS <br />Weaver noted the Cornelius contaminated groundwater pumping <br />project, as discussed during the Consideration of Communica- <br />tions portion of the meeting. <br />
The URL can be used to link to this page
Your browser does not support the video tag.