Laserfiche WebLink
At 8% interest, this would be $5,453 per year over 10 years or $273/year/unit. The above <br />cost of drainage connection, however, would cost the same in either upgrading to an <br />acceptable gravel road or a paved road. <br /> <br />Action: <br /> <br />Based upon discussion <br />Reviewed by: <br /> <br />Director of Public Works <br />Principal City Engineer <br />Street Maintenance Supervisor <br /> <br />PW: 05/21/02 <br /> <br />-303- <br /> <br /> <br />