My WebLink
|
Help
|
About
|
Sign Out
Home
Airport Improvement Program March 11, 1988
Ramsey
>
Public
>
Dissolved Boards/Commissions/Committees
>
Airport Commission
>
Miscellaneous
>
Airport Improvement Program March 11, 1988
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2024 3:31:34 PM
Creation date
5/11/2010 11:58:18 AM
Metadata
Fields
Template:
Miscellaneous
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
136
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Economic impacts to the aviation businesses can be minimized by <br />staging construction in the manner that least impacts operations <br />at the airport. It is anticipated, however, that grading opera- <br />tions will require closure of the airport for varying periods of <br />time. The schedule of construction and operational safety plan <br />will be coordinated with the FAA, Mn/DOT, FBO, contractor, and <br />airport users. The construction specifications will include <br />appropriate restrictions and schedules for the contractor. <br />The long term gains resulting from an improved public airport <br />facility include increased safety, efficiency, and service to <br />users and residents within the community and the region. <br />Construction of a 3300 foot paved runway with the recommended <br />lighting and approach aids will enhance the capability of Gateway <br />North Industrial Airport to accomodate growth in aviation <br />demands in the area. The improved facility will also prove to be <br />a long term asset attractive to those in the business community <br />who use aircraft or whose vendors and clients use general <br />aviation aircraft. <br />5-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.