Laserfiche WebLink
Mr. Jack Ippel <br />PHASE II <br />11. Airport Zoning <br />-4- <br />December 13, 1983 <br />A. Prepare Imaginary Surface Plan <br />B. Prepare Land Use Safety Zone Plan <br />C. Prepare Zoning Ordinance <br />D. Coordinate with City and Reviewing Agencies <br />E. Public Hearing (one meeting) <br />SUMMARY:. <br />TOTAL COST OF PHASE II - <br />Total State Share City Share <br />Phase Ia $29,900.00 $23,920.00 $5,980.00 <br />Phase Ib $4,000.00 $3,200.00 $800.00 <br />Phase II $6,500.00 $5,200.00 $1,300.00 <br />Total Engineering <br />Cost - $40,400.00 $32,320.00 $8,080.00 <br />$6,500.00 <br />$6,500.00 <br />Phase Ia and II are not-to-exceed amounts except for Item 5A. where the Aerial <br />Topography could increase by $1,050.00 if amore recent topography is required. <br />Phase Ib, Public Participation is proposed to be completed on a time and <br />materials basis allowing for hearing preparation, attendance at hearings and <br />material costs for audio and visual display. This work will run concurrent <br />with Phase Ia. <br />There could be some reduction in the cost of the AMP should the commission <br />members themselves volunteer to do research and/or compile data required for <br />the plan study. <br />The value of this work is difficult to measure at this time without detail <br />discussion with the members. It is proposed that should the study be funded, <br />we could meet with the commission on a regular basis to discuss the plan and <br />seek advice and guidance in developing the final AMP. <br />The proposed schedule of events suggests that it would take six to eight (6-8) <br />months to complete the draft AMP. <br />