My WebLink
|
Help
|
About
|
Sign Out
Home
Executive Summary
Ramsey
>
Public
>
Dissolved Boards/Commissions/Committees
>
Airport Commission
>
Reports
>
Executive Summary
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2010 10:51:51 AM
Creation date
5/12/2010 10:51:51 AM
Metadata
Fields
Template:
Miscellaneous
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~,. I~ ° 1~..a".. <br />I <br />jQ ~"D A K <br />,,,~ <br />---- <br />T j .~ <br />i <br />I Airlake Airport <br />I <br />,.._ ~-, <br />------ ~, -, T -- ~ . <br />~,-- - <br />i I' <br />i <br />i <br />`--'~~ <br />i <br />i <br />R I C E I <br />The operating capacity of Airlake Airport will be <br />adequate to meet projected demand throughout the <br />planning period. Projections of demand indicate that <br />additional landside facilities will be required to serve <br />based aircraft. By the end of the planning period, an <br />additiona15,700 square feet of T-hangaz space should be <br />provided and conventional hangar space should be <br />increased by 33,000 square feet. Additional de-down <br />spaces should also be provided. An additional 1,800 <br />square feet of terminal/administration space will also be <br />needed by the end of the planning period. <br />The Airlake Comprehensive Development Plan, <br />approved by the Council in 1989, recommends extending <br />Runway 11/29 from its existing length of 4,100 feet to <br />5,000 feet; widening of Runway 11/29 to 100 feet is also recommended. The Airlake Comprehensive <br />Development Plan also recommends a 3,500-foot <br />crosswind runway (Runway 4/22) which will help to <br />provide Airlake with increased wind coverage. The <br />proposed crosswind should be equipped with REILs and <br />medium intensity runway lighting (IVIIRL). An airport <br />beacon should also be installed. <br />-21- <br />METROPOLITAN COUNCIL <br />
The URL can be used to link to this page
Your browser does not support the video tag.