Laserfiche WebLink
6/24/75 AC 150/5300-4B <br />CHAPTER 10. <br />Figure 9-2. Airplane Itinerant Operations <br />Figure 9-3. Tiedown Layouts <br />BUILDINGS AND HANGARS <br />45. General <br />46. Hangars <br />47. Administration Building <br />48. Airport Survey <br />49. Building Plan <br />50. Expansion <br />51. Circulation <br />52. Waiting Room <br />53. Manager's Office <br />54. Eating Facilities <br />55. Public Restrooms <br />56. Roads and Auto Parking <br />Figure 10-1. Parking Apron Area <br />Figure 10-2. T-Hangar Layout <br />Figure 10-3. General Aviation Activity <br />Survey Form <br />Figure 10-4. General <br />Inventory Form <br />Figure 10-5. Typical Peak -Hour <br />Figure 10-6. Schematic Flow in <br />Building <br />Figure 10-7. Waiting Area <br />CHAPTER 11. <br />Aviation Space <br />Passengers <br />an Administration <br />MARKING, LIGHTING, AND VISUAL 'AIDS <br />57. General <br />58. Airport Marking <br />59. Airport Lighting <br />60. Airport Visual Aids <br />61. Other Marking Practices <br />Figure 11-1. Airport Marking <br />Figure 11-2. Typical Airport Lighting System <br />Figure 11-3. Typical REILS Installation <br />Figure 11-4. Typical MALSF Installation <br />CHAPTER 12. <br />AIRPORT PAVING <br />62. General <br />63. Stage Construction <br />64. Soil Investigation and Evaluation <br />65. Pavement Thickness <br />66. Soil Stabilization <br />Page <br />•49 <br />5o <br />51 <br />51 <br />51 <br />51 <br />52 <br />53 <br />54 <br />54 <br />54 <br />55 <br />55 <br />56 <br />56 <br />58 <br />59 <br />6o <br />61 <br />62 <br />63 <br />64 <br />65 <br />65 <br />65 <br />66 <br />66 <br />68 <br />69 <br />70 <br />71 <br />72 <br />73 <br />73 <br />73 <br />74 <br />75 <br />76 <br />Page iii <br />