Laserfiche WebLink
6/24/75 <br />F.A.A. <br />ITEM <br />NO, <br />P-I51 <br />NISI <br />SUMMARY OF QUANTITIES <br />DESCRIPTION <br />CLEARING <br />GRUBBING <br />P-152 GRADING -UNCLASSIFIED EXCAVATION <br />0-701 DRAINAGE -PIPE IB° <br />PAVING -RUNWAY, TAXIWAYS B APRON <br />P-154 SUBBASE COURSE <br />P-208 BASE COURSE <br />P-602 PRIME COAT <br />P.401 BITUMINOUS SURFACE COURSE <br />P.401 ASPHALT CEMENT <br />LIGHTING, MEDIUM INTENSITY <br />L-802 RUNWAY LIGHTS <br />L-802 THRESHOLD LIGHTS. GREEN <br />L-822 TAXIWAY LIGHTS. BLUE <br />L-829 TAXIWAY SIGNS <br />L- 107 LIGHTED WIND CONE <br />L- 109 POWER B CONTROL EQUIPMENT <br />L-824B CABLE <br />L-108 TRENCH <br />L-10B DUCT <br />L-8248 COUNTERPOISE WIRE <br />rt SEGMENTED CIRCLE MARKER <br />L-801 BEACON <br />Y BEACON TOWER <br />T-901 SEEDING <br />T-908 MULCHING <br />PAVING - ACCESS ROAD <br />P-I54 SUBBASE COURSE <br />P-208 BASE COURSE <br />P-602 PRIME COAT <br />P-401 BITUMINOUS SURFACE COURSE <br />P-401 ASPHALT CEMENT <br />F-16I FENCING PERIMETER <br />F -162 FENCING- SECURITY <br />UNIT <br />ACRE <br />ACRE <br />CU. YARD <br />LIN. FT <br />CU YARD <br />CU YARD <br />GAL <br />TON <br />GAL <br />EACH <br />EACH <br />EACH <br />EACH <br />EACH <br />LUMP SUM <br />LIN FT <br />LIN FT <br />LIN. FT <br />LIN FT <br />LUMP SUM <br />EACH <br />EACH <br />ACRE <br />ACRE <br />CV YARD <br />CU. YARD <br />GAL <br />TON <br />GAL <br />LIN FT <br />LIN FT <br />P-620 MARKING OF RUNWAY & TAXIWAY SO FT <br />• SEE SPECIAL SPECIFICATION <br />°UAN'ITIES <br />Estimated As -Built <br />(TO <br />BE <br />COMPLETED <br />BY ENGINEER <br />FOR <br />SPECIFIC <br />PROJECT <br />UNDER <br />DESIGN <br />CITY OF AERVILLE <br />USA <br />CONSTRUCTION PLANS FOR <br />AERVILLE MUNICIPAL AIRPORT <br />JANUARY 1, 1969 <br />FAAP PROJECT NO. <br />SPONSOR - CITY of AERVILLE <br />GENERAL DESCRIPTION OF PROJECT: <br />SITE CLEARING, GRUBBING, GRADING, <br />DRAINAGE AND PAVING OF RUNWAY, <br />TAXIWAYS ,APRON AND ACCESS ROAD; <br />AIRPORT LIGHTING SYSTEM. <br />INDEX <br />SHEET NO. TITLE <br />1 COVER SHEET <br />2 PROJECT LAYOUT PLAN <br />3 CONSTRUCTION PLOT PLAN & FENCING <br />4 CLEARING & GRUBBING <br />5 GRADING PLAN <br />6 PROFILES RUNWAY, TAXIWAY & APRON <br />7 PAVING SECTIONS & TIEDOWNS <br />8 DRAINAGE & TURFING <br />9 SOIL BORING PLAN & LOG <br />10 LIGHTING LAYOUT, DIAGRAM & DETAILS <br />11 MARKING AND MISCELLANEOUS DETAILS <br />39'00' N <br />ROESSLER <br />REENE <br />BRENDE <br />KNUDSON <br />m <br />DON COUNTY <br />AIRPORT <br />AC 150/5300-4B <br />Appendix 4 <br />97.00'W <br />VITALE <br />AERVILLE <br />FRUCHT <br />LOCATION MAP <br />0 4 8 16 24 <br />(--.- <br />SCALE IN MILES <br />SPACE RESERVED FOR <br />NECESSARY APPROVALS <br />NO <br />REVISION 6Y LAP <br />CITY of AERVILLE <br />AERVILLE, US.A <br />DATE <br />AERVILLE MUNICIPAL AIRPORT <br />COVER SHEET <br />(CONSULTING FIRM) <br />DRAWN BY I CHECKED BY <br />SCALE I DATE ISHEET0F II <br />Page 3 and 4 <br />