Laserfiche WebLink
AC 150/5100-10A <br />53. PRORATION OF ENGINEERING COSTS. <br />4/13/76 <br />a. General. Where engineering costs relate to construction items or <br />quantities both within and without the scope of the ADAP project, <br />the engineering costs will be allocated to both the eligible and <br />ineligible work. The engineering costs relating to the ineligible <br />construction work is not an allowable cost. In addition, proration <br />of engineering costs may be necessary when eligible items of <br />construction qualify for differing rates of Federal participation. <br />b. Separate Records. Separate time and cost records for engineering <br />work related to eligible and ineligible construction items should <br />be maintained, if practicable. When such records are not maintained, <br />engineering costs generally will be prorated over the entire cost <br />of construction to which the engineering services relate. <br />54.-59. RESERVED. <br />{gage 24 <br />Chap 5 <br />Par 53 <br />• <br />