My WebLink
|
Help
|
About
|
Sign Out
Home
Metropolitan Sytems Information Statement 1989
Ramsey
>
Public
>
Dissolved Boards/Commissions/Committees
>
Airport Commission
>
Miscellaneous
>
Metropolitan Sytems Information Statement 1989
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2024 4:02:47 PM
Creation date
5/13/2010 9:42:18 AM
Metadata
Fields
Template:
Miscellaneous
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
293
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
[FROM SECTION 5, "METROPOLITAN HIGHWAY SYSTEM PLAN, 2010"] <br />(page 59 of the Transportation Development Guide/Policy Plan) <br />Table 3 <br />INVENTORY OF <br />RECOMMENDED IMPROVEMENTS, 2010 HIGHWAY PLAN <br />(dollars In millions) <br />Length <br />Route Segment (miles) Comment Cost <br />I-35W • From 1-694 south to 1-94 common 9.0 Meter, bypass ramps $ 180 <br />section <br />• From 1.94 common section south to 5.0 Add HOV lane or LRT line 120 <br />CSAH 62 <br />• From CSAH 62 south to TH 13 8.0 Add HOV lane or LRT line 190 <br />• From TH 13 south to 1.35E 2.0 Add HOV lane or LRT line 30 <br />1-35E • From 1-694 south to 1-94 6.0 Meter, bypass ramps, spot improvements 40 <br />• From Shepard Rd. south to TH 13 1.0 Spot problem resolution, widen bridge 15 <br />1-94 • From 1-494 junction east to junction 16.0 Complete meter, bypass ramps, add HOV lanes. 60 <br />with 1-694 (portions of this work under way; cost adjusted) <br />• From CSAH 68 east to I.494/1.694 2.0 Add lanes 15 <br />1-494 • From junction with 1-94 south to 1-394 8.0 Meter, bypass ramps 16 <br />• From 1-394 south to CSAH 18 9.0 Meter, bypass ramps, add HOV lane 600 <br />• CSAH 18 to TH 100 2.0 Meter, bypass ramps, add 2 lanes; <br />one of which is an HOV lane <br />• From Th 100 east to 34th Av. 4.0 Meter, bypass ramps, add 1 NOV lane <br />1-694 • From 1-94 east to 1.35W 6.0 Add NOV lane (portions of this work 60 <br />under way; cost adjusted) <br />TH 7 • From TH 101 to the western boundary 6.0 Select capacity and safety inprovements based 10 <br />Chanhassen on resent study <br />TH 10 • From TH 169 southeast to TH 610 9.0 Meter, bypass ramps 18 <br />• From TH 610 southeast to I-35W 3.0 Build 4-lane freeway according to EIS 55 <br />TH 13 • From I-35W east to CSAH 32 2.0 Complete 4-1ane section 5 <br />Note: •CSAH• means County State Aid Highways. TN' means Trunk Highway. "HOV• means high -occupancy vehide. <br />'EIS - means environmental impact statement. Projects not in priority order. <br />59 <br />8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.