My WebLink
|
Help
|
About
|
Sign Out
Home
Metropolitan Sytems Information Statement 1989
Ramsey
>
Public
>
Dissolved Boards/Commissions/Committees
>
Airport Commission
>
Miscellaneous
>
Metropolitan Sytems Information Statement 1989
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2024 4:02:47 PM
Creation date
5/13/2010 9:42:18 AM
Metadata
Fields
Template:
Miscellaneous
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
293
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
[FROM APPENDIX E, "HIGHWAY RANKING PROCESS"] <br />(page 89 of the Transportation Development Guide/Policv Plan) <br />Criteria: <br />B. Increase people -moving capacity of highways through transit and ridesharing. <br />(150 Points) <br />Criteria Measurement: <br />scw340b.tpp <br />If planned improvements on a segment include ramp meters, high -occupancy <br />bypasses and HOV lanes, or light rail transit, then it gets 150 points. If the <br />metered entrance ramps and HOV bypasses planned, then it gets 100 points. <br />only metered entrance ramps, it gets 50 points. Non -controlled access roads <br />points under this criterion. <br />vehicle (HOV) <br />segment has only <br />If the segment has <br />do not get any <br />9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.