My WebLink
|
Help
|
About
|
Sign Out
Home
Airport Zoning
Ramsey
>
Public
>
Dissolved Boards/Commissions/Committees
>
Airport Commission
>
Miscellaneous
>
Airport Zoning
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2024 3:41:14 PM
Creation date
5/13/2010 11:45:25 AM
Metadata
Fields
Template:
Miscellaneous
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
418
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2.( <br />c. Federally —funded airport development program requirements stipulate` <br />that all development programs be reasonably consistent with the plans of <br />planning agencies for the developmont of the area in which the airport is <br />loeated, that fair consideration has been given to the interest of communities <br />in or near the airport, and that development programs provide for the <br />protection and enhancement of the quality of the environment. <br />d. A review of the landing area development proposed on the plan was <br />conducted in accordance with Parts 77, 152, and 157 of the Federal Aviation <br />Regulations (Aeronautical Study No. E7—AGL-1433—NIA). Based on consideretionu <br />of safe and efficient use of airspace, the FAA offers no objection to the <br />prepared ultimate airspace utilization as depicted on the development plan. <br />The development plan will be afforded the status of a plan on file for the <br />purpose of the Federal Aviation Regulation Part 77, Obstruction Evaluations, <br />or Part 152, Airport Aid Program. <br />Due to insufficient information regarding planned development, thix review did <br />not include an evaluation of actual construction for which separate notice is <br />required under Part 77 of the Federal Aviation Regulations. Prior to <br />constructing any facility, structure, or other items on the airport, notice <br />consistent with requireeente of Part 77 must be filed and evaluated (FAA Fora <br />7460-1). <br />If action or construction is planned without Federal aid which will change the <br />status or the geometries of runways, taxiways, aprons, or other operating <br />areas of the airport, notice must be filed in accordance with FAR. 157 (FAA <br />Form 74e0-1). <br />We trust the foregoing provides a reasonable explanation of the conditions <br />inherent in our approval. If, however, either you or the sponsor desires a <br />further clarification, please do not heeitate to contact this office. <br />Sincerely, <br />Caigmel Signed by4 <br />OREN R. &URCX$MPI <br />Oren R. Burckhardt <br />Airports Engineer <br />Enclosure <br />cci <br />AGL-610 <br />(w/o encl) <br />AGL-220 <br />AGL-420 <br />Gateway Industrial North Airport/ <br />AGL-520 <br />
The URL can be used to link to this page
Your browser does not support the video tag.