Laserfiche WebLink
Since submittal of the Phase I draft study, two additional <br />meetings have been held. On May 15, 1985, the Airport Commission <br />held a joint meeting (open to the public) which included the <br />Ramsey City Council, the City Planning Commission, and the <br />Economic Development Commission to review the draft Master Plan <br />Study. A public informational meeting was held May 29, 1985 by <br />the Airport Commission to present their findings of the impor- <br />tance of airports to other communities. The airport layout plan <br />and preliminary cost estimates were again presented. <br />A public hearing on the Master Plan Study was held by the Airport <br />Commission on August 21, 1985 with an additional 10 day comment <br />period. The Airport Master Plan Study was subsequently endorsed <br />by the Ramsey Airport Commission and the Ramsey Economic <br />Development Commission. The Ramsey City Council adopted the <br />Master Study by resolution on October 8, 1985. <br />While no federal funds have been committed to this study, the <br />procedures used for this study are in accordance with Federal <br />Aviation Administration Guidelines in Advisory Circulars <br />150/5050-4, Citizen Participation in Airport Planning, and <br />150/5070-6, Airport Master Plans. <br />1-2 <br />