My WebLink
|
Help
|
About
|
Sign Out
Home
Airport Master Plan October 1985
Ramsey
>
Public
>
Dissolved Boards/Commissions/Committees
>
Airport Commission
>
Miscellaneous
>
Airport Master Plan October 1985
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2024 3:34:43 PM
Creation date
5/18/2010 9:01:56 AM
Metadata
Fields
Template:
Miscellaneous
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
177
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The general guideline used to determine the space <br />requirements of an administration building is <br />based on the number of peak hour itinerant <br />passengers multiplied by 50 square feet. The <br />projected arrival departure building requirements <br />are: <br />1984 1990 1995 2005 <br />Peak Hour Itinerant <br />Passenger 3 8 13 23 <br />Arrival/Departure <br />Facility (SF) 150 400 650 1150 <br />Additional land should be reserved to provide <br />parking space for FB0 facilities, the vocational — <br />technical institute, and individual hangars. <br />6.8.5 Parking Requirements <br />A general guideline is to provide 1.3 parking <br />spaces per peak hour passenger. The forecast auto <br />parking requirements thus are: <br />1984 1990 1995 2005 <br />Parking Space <br />Requirements 4 10 17 30 <br />6-9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.