Laserfiche WebLink
-140- <br /> <br />· All public streets shall be 28 feet wide as measured from back of curb to back of curb and <br /> shall have parking restricted to one side of the street. <br />· The one-way streets around the center green shall be 20 feet wide from back of curb to back <br /> of curb and will not allow any on-street parking. <br />· The one-waysrreets on the main north-south road spine entering from Sunwood Dr. shall be <br /> 16 feet wide from back of curb to back of curb and will not allow any on-street parking. <br />· The one-way private streets in the cottage area shall be 18 feet from back of curb to back of <br /> curb with parking only allowed in the designated pull-offparking nodes. <br />· The two-way private streets in the cottage area shall be 24 feet wide from back of curb to <br /> back of curb and will not allow any on-street parking. <br /> <br />The street widths shown on the submitted final plat is consistent with the approved preliminary plat. <br />The final plat also shows the connection of Tungsten Way and 146~h Ave. as directed by the City <br />Council <br /> <br />A set of construction plans have been submitted and reviewed by City Staff. A letter requesting <br />modifications to the construction plans was sent to the Developer on April 4, 2003. The most <br />significant comments focused on drainage and utility easements running between lots in two <br />locations. A ten-foot easement was proposed by the Developer, whereas Staff is requiring a <br />minimum easement width of 20 feet. Revised construction plans have not been received by the City <br />at the time this final plat case. It should be noted that correcting the plans in accordance with the <br />comments contained in the April 4, 2003 letter may alter the configuration of the development's <br />infrastructure. Staffwill be continuing to work on these issues <br /> <br />Recommendation: <br /> <br />Staff is working with the .applicant on correcting issues relating to the corrections needed on the <br />construction plans. Staff plans on bringing forward a recommendation on the final plat at the <br />meeting. <br /> <br />City Council Action: <br /> <br />Will be based on discussion. <br /> V <br /> <br />Review Checklist: <br />City Engineer <br />Community Development Director <br />Parks & Utilities Supervisor <br /> <br />CC: 04/22/03 <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />! <br />! <br />I <br />I <br />! <br />! <br />I <br />I <br />i <br /> <br /> <br />