Laserfiche WebLink
<br />CHANGE ORDER - EAST MEANDERING COMMONS PARK GRADING <br /> <br />TOPSOIL RESOLUTION: <br /> <br />Deduct 5,081 CY of vegetative growing medium from the liner installation lump sum, at the <br />contracted unit price of topsoil borrow. 5,081 CY x $ 14.70/CY = $74,690.70 <br /> <br />Add placement of 5,081 CY of granular on-site topsoil at the contracted unit price for common <br />borrow. 5,081 CY x $5.78/CY = $29,368.18 <br /> <br />NET CHANGE: <br /> <br />$45,322.52 Deduct <br /> <br />SOIL CORRECTIONS REQUIRED FOR RETAINING WALL AND AMPHITHEATER <br />CONSTRUCTION: <br /> <br />Add 6,204 CY of subgrade excavation for poor site soils encountered during excavation at the <br />contracted unit price. 6,204 CY x $3.15/CY = $19,542.60 <br /> <br />Add 8,650 CY of common borrow for import material to complete soil corrections at the <br />contracted unit price. 8,650 CY x $5.78/CY = $49,997.00 <br /> <br />NET CHANGE: <br /> <br />$69,539.60 Add <br /> <br />IMPORT OF REQUIRED MATERIAL TO COMPLETE APPROVED GRADING PLAN: <br /> <br />Add 7,500 CY of common borrow for import material to implement the site grading plan at the <br />contracted unit price. 7,500 CY x $5.78/CY = $43,350.00 <br /> <br />NET CHANGE: <br /> <br />$43,350.00 Add <br /> <br />TOT AL CHANGE REQUESTED: <br /> <br />$67,567.08 <br />