My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 08/09/2010
Ramsey
>
Public
>
Agendas
>
Council
>
2010
>
Agenda - Council - 08/09/2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2025 2:43:11 PM
Creation date
8/5/2010 3:20:04 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
08/09/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
179
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />CASE #1 <br /> <br />CONSIDER PAVING BITUMINOUS TRAIL ALONG ALPINE DRIVE <br />By: Steven Jankowski, Assistant City Engineer <br /> <br />Background: <br /> <br />Staff has been directed to prepare an estimate to consider the construction a ten foot wide <br />bituminous trail in conjunction with the mill and overlay project scheduled for later this fall <br />along Alpine Drive, between Highway 10 and Puma Street. In addition to the segment <br />coinciding with the overlay project, staff is also presenting additional trail segments which might <br />also be considered to increase connectivity of the City trail system, These streets currently have <br />wide paved shoulders which make travel reasonably safe to destinations farther east and north <br />along both of these streets. <br /> <br />Attached to this case is a figure which illustrates both the existing and proposed trail sections for <br />consideration. Proposed Segment A would extend from Highway 10 to a point 900 feet <br />southeast of Andrie Street where it would connect with an existing trail that extends eastward <br />and northward around Lake Itasca. This segment would also require a concrete railroad crossing <br />at the tracks. <br /> <br />Proposed Segment B would connect to a point on the existing trail system which parallels Alpine <br />Drive along the northern right of way. The City owns the short north/south segment needed to <br />make the connection between the existing trail around Lake Itasca and Alpine Drive. This <br />segment would continue eastward to Armstrong Blvd where it would connect to an existing trail <br />east of Armstrong Boulevard to Variolite Street. <br /> <br />Proposed Segment C would extend southward from Alpine Drive, r,long Armstrong Boulevard, <br />to Bunker Lake Boulevard. This would complete a trail conr,ection between the western <br />residential neighborhoods and the COR. <br /> <br />Financial: <br /> <br />The Table Below provides information for each length of proposed trail: <br /> <br /> Segment A Segment B Segment C Total <br />Length 3,440 ft 5,745 ft 3,060 ft <br />Trail const cost $68,000 $114,900 $61,000 <br />Other cost $25,000 RR X-ing $30,000 fill <br />Total Const. Cost $93,000 $144,900 $61,000 $298,900 <br />Total Cost w/OH $116,250 $181 , 125 $76,250 $373,625 <br />Funding sources 100% MSA 93% MSA 100% MSA 97% MSA <br />
The URL can be used to link to this page
Your browser does not support the video tag.