Laserfiche WebLink
I <br />! <br /> Anderson <br /> Assoc., Inc. <br />I May 15, 2003 <br /> <br />3601 Thumton Avenue. Suite 101. Anoka. MN 55303 <br /> Phone: 763/427-5860 Fa~: 763/427-0520 <br /> <br />I <br />I <br />I <br />I <br />I <br /> <br />Brian Olaon, Principal City Engineer <br />City of Ramse¥ <br />15153 Now[hen Blvd. NW <br />Ramsey, MN 55303-6197 <br /> <br />Re: Alp/ne Acres <br /> Oak. Creek Builders <br /> <br />Dear Brian: <br /> <br />We have prepared an opinion of casts for the .installation of the trunk sanitary sewer and <br />watermain to serve Alpine Acres. In preparation 0ftl~e overs/z~ng costs we have quantified the <br />costs associated with the following segments of pipe. <br /> <br /> 1, Tnmk utility extensions required to ser~e the site. <br /> <br /> 2. Trill< uti]_ity oversize extensions through the site. <br /> <br /> 3. Additions/mmic san/taw sewer to extend to the east and west. <br /> 4. Comparison of tnmk utilities proposed with the Allstate Development proposal.: <br /> <br /> 5. Available tnmk utility credits. <br /> <br />The quantities are based on the Preliminary Utility Plan sheei: 6, and the un/t costs are provided. <br />by the utility contractor of S. R. W~idema. The trunk sarfitary sewer and waterma/n ere~[i~s for <br />eacl¢ segment of pipe are as follows: <br /> <br />1. Trunk utility extensions requked to service ~e site: <br /> <br />30" Sadtary sewer from ex/sting manhole to plat boundary (A-B) <br />12" Waterma/n from e,,dsting stub to plat boundary <br />8" Watermain across Alpine to plat <br /> Subtotal: <br /> <br />$155,124.00 <br />$ 91,450.00 <br />$_L434~o.0o <br />$260,914,00 <br /> <br />Trunk utility oversize extensions fltrough the <br />30" vs. 8" Sanitary sewer oversize CB-C) <br />12" vs, 8" Waterma/n oversize <br /> <br />Subtotal: <br /> <br />$287,382.00 <br />$ 21.552.00 <br /> <br />$308,934.00 <br /> <br />Additional trunk sanitary sewer extensions through site: <br />18" vs. 8" Sewer extension to NE pas~ Nowthen Blvd..(C-D) <br />30" vs. 8" Sewer extension to NW past Sunfish La/ce Blvd.(C-E) <br /> Subtotal: <br /> <br />$ a9,oo2.Oo <br /> <br />$247,932.00 <br /> <br />O:\PRF'/AT~BS000~J 145~O 145~3 bo, doc <br /> <br />~ /-~ ' .2 ~lf~i~ · ~kl <br /> <br />Zand Survqlngfir -'~i',',~ <br /> <br />I,IH~Y · QY <br /> <br />-343-3 <br /> <br /> <br />