Laserfiche WebLink
ALPINE ACRES <br />TRUNK UTILITY COSTS <br /> <br />2. 30" vs 8'" Sewer Oversize thru Site (B - C) <br />;0" Trunk Sewer <br /> <br />30" RCP CL5 - Unlined >22 1415 $182.00 $257,530.00 <br />Manhole 0 - 10' 8 $4,295.00 $34,360.00 <br />Extra Depth Manhole 168 $98.50 $16,548..00 <br />30 x 4" Tee 22 $240.00 $5,280.00 <br />8" Drop 5 $2,995.00 $I4,975.00 <br />4" Riser Pipe 22 x 20 440 $11.7.0. $5,148.00 <br />4" Service Pipe 22 x 30 660 $9.05 $5,973.00 <br /> Subtotal $339,814.00 <br /> <br /> Engineering and Administration 10% $33,981.40 <br /> Total (B - C) $373,795.40 <br />8" Lateral Sewer <br /> <br />8" PVC SDR.35 1415 $21.50 $30,422.50 <br />Manhole 0 - 10' 8 $1,655.00 $13,240.00 <br />Extra Depth Manhole .- 24 $95.00 $2,280.00 <br />8 x 4 Wye 22 $40.00 $880.00 <br /> <br />4" Service Pipe _ 660 ... $8.50. $5,610.00 <br /> Subtotall $52,432.50 <br /> Engineering and Administration 10% $5,243.25 <br /> Total (B - C) $57,675.75 <br /> Oversize Credit (30" vs 8") $316,119.65 <br /> <br />-g46-G: Shacedocs/Private/3000/3145/3145[abuiation <br /> <br /> I <br /> I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />.I <br />I <br />! <br />I <br />I <br />I <br /> <br /> <br />