Laserfiche WebLink
ALPINE ACRES <br />TRUNK UTILITY COSTS <br /> <br />2. 1 2" vs. 8" Watermain Oversize through Site (G - l) <br />12" Trunk WatermaJn <br /> <br />12" DIP 2310 $31.45 $72,649.50 <br />12" BFV 4 $900.00 $3,600.00 <br />6" GV 7 $500.00 $3,500.00 <br />Hydrant 7 $1,920.00 $13,440..00 <br />12 x 6 Tee 17 $295.00 $5,015.00 <br />12" x 12" Tee 3 $345.00 $1,035.00~ <br />12" Bend 8 $250.00 $2,000.00 <br />1" Service Connections 14 $95.00 $1,330.00~ <br />I"K Service Restoration 550 $8.90 $4,895.00 <br />Restoration 0 $5,000.00 $0.00 <br />6" DIP 105 $15.80 $1,659.00 <br /> Subtotal $109,123.50 <br /> <br /> Engineering and Administration 10% $10,912.35 <br /> Total (G -I) $120,035.85 <br />8" Lateral Watermain <br /> <br />8" DIP .. 2310 $23.80' $54,978.00 <br />8" GV 4 $695.00 $2,780.00 <br />6" GV ' 7 $500.00, $3,500.00 <br />Hydrant 7 $1,920.00 i $13,440.00 <br />,8 x 6 Tee i7 $195.00 $3,315.00 <br />8" x 8" Tee 3 $210.00 $630.00 <br />8" Bends 8 $165.00 $1,320.00 <br />:1" Service Connectors 14 $95.00 $1,330.00 <br />1" K Service 550 $8.40 $4,620.00 <br />6" DIP 105 $15.80 $1,659.00 <br /> Subtotal $87,572.00 <br /> <br /> Engineering and Administration 10% $8,757.20 <br /> Total (G -I) $96,329.20 <br /> Oversize Credit (12" vs 8") $23,706.65 <br /> <br />G: Sharedocs/P rivate/300013145/3145tabulation -347-7 <br /> <br /> <br />