Laserfiche WebLink
ALPINE ACRES <br />TRUNK UTILITY COSTS <br /> <br />3. Extension through Site Extending Past Nowthen (C - D) <br /> <br /> ;0" Trunk Sewer (Used as comparison to Allstate Development) <br /> <br />30" RCP CL5 - Unlined >22 400 $182.00 $72,800.00 <br />Manhole 0 - 10' 1 $4,295.00 $4,295.00 <br />Extra DepthrManhole 27 $98.50 $2,659.50 <br />42" Boring ._ 140 $408.00 $57,120.00 <br />30 x 4" Tee 8 $240.00 $1,920.~30 <br />4" Riser Pipe 160 $11.70 $1,872.00 <br />4" Service Pipe 240 $9.05 $2,172.00 <br /> Subtotal $142,838.50 <br /> <br /> Engineering and Administration 10% $14,283.85 <br /> Total (C - D) $157,122.35 <br />18" Trunk Sewer <br /> <br />18" PVC SDR 26 400 $83.30 $33,320.00 <br />Manhole 0 - 10' 1 $4,295.00 $4,295.00 <br />Extra Depth Manhole 27 $98.50 $2,659.50 <br />18 X 4 Tee 8 $605.00 $4,840.00 <br />4" Riser 160 $11.70 $1,872.00 <br />4" Service Pipe 240 $9.05 $2,172.00 <br />30" Boring 140 $348.60 $48,804.00 <br /> Subtotal $97,962.50 <br /> <br /> Engineering and Administration 10% $9,796.25 <br /> Total (C - B) $107,758.75 <br />8" Lateral Sewer <br /> <br />8" PVC SDR 35 230 $21.50 $4,945.00 <br />Manhole 0 - 10' 1 $1,655.00 $1,655.00 <br />8 x 4 Wye 8 $4O.O0 $.3,2O.OO <br />4" Service Pipe 240 $8.50! $2,040.00 <br /> Subtotal $8,960.00 <br /> <br /> Engineering and Administration 10% $896.00 <br /> Total (C - D) $9,856.00 <br /> Oversize Credit (18" vs 8") $97,902.75i <br /> <br />-~348~: Sharedocs/Private/3000/3145/3145[abulation <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />.I <br />I <br />! <br />I <br />I <br />I' <br /> <br /> <br />