Laserfiche WebLink
ALPINE ACRES <br />TRUNK UTILITY COSTS <br /> <br />3. Extension through Site Extending Past Sunfish Lake Blvd. (C - E) <br />30" Trunk Sewer <br /> <br />30" RCP CL5 - Unlined >22 545 $167.00 $91,015.00 <br />Manhole 0 - 10' 2 $4,295.001 $8,590.00 <br />Extra Depth Manhole 38 $98.50 $3,743,00 <br />42" Boring 140 $408.00 $57,120.00 <br />8" Drop 1 $2,995.00 $2,995.00' <br /> Subtotal $163,463.00 <br /> <br /> Engineering. and Administration !0% $16,346.30 <br /> Total $179,809.30 <br />8" Lateral Sewer <br /> <br />8" PVC SDR 35 125 $21.50 $2,687.50 <br />Manhole 0 - 10' 1 $1,655.00 $1,655.00 <br />Extra Depth Manhole 2 $95.00 $190.00 <br /> <br /> - Subtotal $4,532.50 <br /> Engineering and Administration 10% $453.25 <br /> Total $4,985.75 <br /> Oversize Credit $174,823.55 <br /> <br />G: Sharedocs/Private/3000/3145/3145tabulation _349~J <br /> <br /> <br />