My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 06/10/2003
Ramsey
>
Public
>
Agendas
>
Council
>
2003
>
Agenda - Council - 06/10/2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/24/2025 3:49:53 PM
Creation date
8/29/2003 3:22:50 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
06/10/2003
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
446
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bonding & Legal 2% <br /> <br />City Staff Administration 5% <br /> <br />Contingencies 10% <br /> <br />The summary of estimated cost of construction plus overhead and easements <br />are shown below in Table 1. <br /> <br />TABLE 1 <br /> <br />6.0 <br /> <br />SUMMARY OF ESTIMATED TOTAL PROJECT COST <br /> <br />· Street Construction Cost (,,.$ 83,881.) <br />· Storm Drainage Construction.Cost <br />· 'Water Construction Cost $ ~ 046 <br />· Sanitary Sewer Construction Cost $ 48,653 <br />· Total Estimated Construction Cost $237,000 <br /> <br />· Construction Overhead Cost (33%) $7'8,210 <br /> Total Project Construction Cost $31,5,210 <br /> <br /> $ 4,000 <br /> $31g,210 <br /> <br />Easement Cost (0.1 Acres @ <br />$40,0001 Acre) <br /> <br />Total Project Oost <br /> <br />In projecting the estimated costs of construction, data from projects constructed ' <br />in the metropolitan area over the last several 'years and a working knowledge of <br />the construction activity in the area were used. These costs are expressed in - <br />current dollars. · <br /> <br />METHOD OF PAYMENT <br /> <br />The preferred method for financing the proposed improvements is to assess the <br />benefited properties on a front footage basis or on another equitable measurable <br />basis for the immediate area in accordance with Minnesota Statutes 4-29. Under <br />this method, the cost of the project would be assessed annually on the property <br />within the subdivision for a period of ten (10) years. Section 7.0 of this report <br />discusses the cost allocation. Only the street improvements , excluding the <br />storm drainage, will be paid for by assessments. <br /> <br />The storm drainage cost will be paid by the City's Storm Water Utility Fund. <br /> <br />The cost of the water and sanitary sewer will be paid with hookup fees at the time <br />of hookup per the City schedule of Rates and Charges. He time of hookup is <br />voluntary for lots that are already developed with a house upon it with an <br /> <br />Page 5 <br />G:\M unicipaAARAMSEY\632~RA632FS R.do¢ -42~ <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.