My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 06/10/2003
Ramsey
>
Public
>
Agendas
>
Council
>
2003
>
Agenda - Council - 06/10/2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/24/2025 3:49:53 PM
Creation date
8/29/2003 3:22:50 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
06/10/2003
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
446
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7.0 <br /> <br />operational septic system, However, the City has an ordinance that requires <br />immediate hookup for newly created or subdivided lots. Upon sale of existing <br />lots with an existing residence, there is an additional Ordinance that requires <br />connection to city services, if they are available. The sixty day waiting period <br />required for public comment on this feasibilib/report 'will give the City' Council an <br />opportunity to repeal this ordinance. <br /> <br />The staff has proposed to the residents of the subdivision that the assessments <br />be made per the eight groups of two or three lots each owned by e:ach resident. <br /> <br />COST ALLOCATION <br /> <br />Streets <br /> <br />Since the project, area had bituminous streets, the City Policy states that only one <br />half of the street construction costs are.to be assessed to the benefited area. <br />The cost for concrete curb and gutter are included since the street has <br />bituminous curbs' now. Following is a breakdown of the costs for the proposed <br />project: <br /> <br />Construction Cost of Streets $ 83,881 <br />Plus 33% Overhead <br /> <br />Total Cost of Street Construction <br />Less City's 50% Sha~e of Street Construction $ 55,781 <br />Net Project Cost to be Assessed $ 55,781 <br />Number of Properties-.Assessed 8 <br />Total Cost Per Property For Street $ 6,973 <br /> <br />Annual Assessment per Property For Street Construction <br /> <br />$ 27,68t <br />$111,562 <br /> <br />$ 993 <br /> <br />The.project cost allocations are based on the division of the cost equally between <br />-the eight property owner groups. The annual cost to each property owner is <br />based on amortizing over 10 years at 2.0 percent over the prime rate at'the time <br />of the assessment hearing. A 7.0 percent interest rate is used in these <br />calculations. See Table 6 for a list of proposed assessments. <br /> <br />Storm Drainaqe <br /> <br />The City will pay for the storm drainage construction and easement cost from the <br />City's Storm Water Utility Fund. However, the City will use the 25% shared cost <br />allocated to the Helium Street properties north of Pondvale Estates in the <br />negotiation for right-of-way across those benefited properties. The 25'% shared <br />cost was based on drainage areas. This shared cost is calculated below. <br /> <br />~age 6 <br />G:\Municip aI~ARAMSEY\632\RA~32FS R.doc <br /> <br />I <br />I <br />I <br />I <br />I <br /> <br />I <br />I <br />I <br />I <br />I <br />i <br />I <br />I <br />I <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.