My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 06/10/2003
Ramsey
>
Public
>
Agendas
>
Council
>
2003
>
Agenda - Council - 06/10/2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/24/2025 3:49:53 PM
Creation date
8/29/2003 3:22:50 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
06/10/2003
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
446
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br />I <br />I <br />I <br /> <br />I <br /> <br /> I <br />I, <br /> <br />'! <br /> <br />I <br />I <br />I <br />I <br /> <br /> FEASIBILITY STUDY <br /> OPTION 2 EXHISIT E <br /> SHARED FACILITIES COST <br />City of Ramsey Improvement Project No. 02-20 <br />Helium Street Extension <br /> Streets,Wa[er Sewer <br /> <br />Shared Cost W~ith Project 02-22(PONDVALE) <br /> ¢:stimated <br />Item Number of <br /> Ne. Oeecriplian Units Unit Unit Cost Estimated Cost <br /> <br /> ~ JCommon Exc~vation(Oeten~ton Pond ) 800 <br /> ~ 15"RCP C~ass Ill J 120 J LF I S2~.00 J ~2,880.00 <br /> 3 18'RCP Class III J 160 ~ LF ~ ~30.00 ~ ~4,800.00 <br /> ~ ~5"RC~ FES I ~ ~ &ACH~ ~500.00 ~ $500.00 <br /> 5 18"RC~ ~ES j 1 ~CH ~ $600.00~ $600.00 <br /> ~ MH/C8 Storm Drainage S~c~ure j 2 ~CHI, 31,500.00 ~ ~3,000.00 <br /> 7 Guile{ Control S~uc~re{ 1 ( ~CH ~ ~2,000.00 <br /> 8 Rio Re0 Class III 10 ~ CY $75.00 $750.00 <br /> 9 5eedin~ - Ty~e Lawn Restoration 0.2 ~ ACRE, ~3,000.00 $600.00 <br /> 10 Seedin~ Mixture - 608 I00 ~ L~S ~4.75 $475.00 <br /> 11 Commeroal ~e~ilizar, 10-10-10 500 ~ LaS $0.50 $250.00 <br /> <br /> 12 Hyd~ulic Soil Stabdizer Ty0e 5 1.5~ TON ~350.00 $525.00' <br /> <br /> 13 Tree C~eann~ Individual Trees > 4" ~ 20 ~ ~CH $~ 5300.00 ~J ~6,000.00 <br /> Total · Shared Cost With Project 02-Z2 $25,580 <br /> AIIocati&n of Construction Cost [o <br /> Project 02-~0 ~ Z5% ~6,395 <br /> [Storm 0ramage ~asements ~ 0.1 ~ ACRE I $40,000.00 { ~4,000.00 <br /> Allocation o~ Easement Cost to <br /> Project 02-~0 ~ ~5% $1,000 <br /> <br />'Shared Cost With Project 02-21 (1 52nd AVE.) <br />Item Estimated <br /> Number of <br /> No. ! Oesc~'6tion Units Unit Unit Cost Es~Jmated Cost <br /> Storm Oraina~e and Oetention Pond <br /> <br /> 1 Common ~xcavation(Oetention Pond - 02-21) 1,500 CY $4.00 $6,000.00 <br /> 2 18'RCP Class III 160 LF $00.00 $4,800.00 <br /> 3 24'RCP C)<3ss III 160 LF 54.S.O0 57,200.00 <br /> 4 30'RCP Class III 330 LF $60.00 $19,800.00 <br /> <br /> 5 18'RCP FES I EACH $600.00 $600.00 <br /> <br /> 6 24'RCP FES 9 t F_ACH $750.00 $6,760.00 <br /> 7 30"RCP FES I] ~,CH $900.00 $900.00 <br /> <br /> 8 MHIC8 Storm Orainage Structure 2 I ~ACH $1,500.00 I $3.000.00 <br /> <br /> 9 IOuMet Control Structure 1 ~ACH i $2,000.00I $2,000.00 <br /> 10 iRip Rap Class ill 10 CY ] $75.00 <br /> 11 Seedin(~. TTpe Lawn Restoration 0.75 ACRE $3,000.00 $2.250.00 <br /> <br /> 12 Seedin(~ Mixture - 808 100 LBS $4.75 $475.00 <br /> <br /> 13 Commercial Fertilizer. 10-10-t0 500LBS I $0.50 $250.00 <br /> <br /> 14 ~H,vdraulic Soil StaOilizer Type 5 2 TON $3S0.00 $700.00 <br /> <br /> 15 Tree Cleannc~ Individual Trees > 4' 20 ~ACH $300.00 $6,000.00 <br /> <br /> Sub-Total $61,475.o0 <br /> Total - Shared Cost With Projeo~. 02-21 $6'1,475 <br /> AIIoc;ztion of Construction Cost to <br /> Pro)ecl 0'2-21 ~ 50% ";30,737.50 <br /> I <br /> S{orm Drainage Easements 0.75 ACRE $40,000.00 I $30,000.00 <br /> Total R.O.W. & Easements Cost $30,000.00 <br /> Allocation of R.O.W. & Easement Cost to <br /> Project 02-21 @ 50% $15,000.00 <br /> <br />7/16/02 <br /> <br />7116JQ~. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.