My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 10/19/2010
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2010 - 2019
>
2010
>
Agenda - Public Works Committee - 10/19/2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 9:58:32 AM
Creation date
10/14/2010 2:24:02 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
10/19/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Brian Olson <br />City of Ramsey <br />Request for Additional Engineering Services Amendment No. 4 <br />CSAH 83 Reconstruction, Ramsey, Minnesota - C.P. 06-20 <br />January 8, 2010 <br />Page 2 <br />110. Preparation of Bid Package <br />Prepare 100% proposal package including an Advertisement for Bid for <br />County use in bidding. <br />The estimated hours for this additional item is included in the attached Amended <br />Project Fee Estimate under PROJECT MANAGEMENT Task 110. <br />121/122. Additional Utility Coordination Meeting <br />Schedule, prepare for, and oversee one additional Utility Coordination <br />Meeting to supplement the project's earlier Utility Coordination Meeting <br />in January 2007. Prepare and distribute agendas, exhibits, and minutes for <br />the meeting. <br />The estimated hours for these additional items are included in the attached <br />Amended Project Fee Estimate under PROJECT MANAGEMENT Tasks 121 and <br />122. <br />B. Add the following under II.E - DETAIL DESIGN PLANS AND <br />SPECIFICATIONS: <br />10. Complete Detail Design Activities for 90% Submittal <br />Additional time spent for the detail design of and the preparation of 90% <br />plans for the project incorporating the new project limits. <br />The fee for this additional item is included in the attached Amended Project Fee <br />Estimate under DETAIL DESIGN <br />11. Additional Right -of -Way Platting Services <br />Extend the scope of Right -of -Way Platting services from 13 parcels to 19 <br />parcels. Additional services for these parcels include field locating, <br />basemap drafting, and platting. <br />The fee for this additional item is included in the attached Amended Project Fee <br />Estimate under Subconsultant Expenses. <br />12. Incorporate 90% Comments and Complete Final Plans, Specifications, and <br />Estimate <br />The fee for this additional item is included in the attached Amended Project Fee <br />Estimate under Subconsultant Expenses. <br />C. Add the following under II.F - ASSUMPTIONS: <br />4. Design and right-of-way acquisition are to be based on the new project <br />limits reflected in TKDA's 90% plan submitted 9-04-09. <br />5. Design is to be based on completed surveys. No additional surveys are <br />requested or included. <br />6. The design of additional utility extensions or relocations is not included. <br />
The URL can be used to link to this page
Your browser does not support the video tag.