My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 10/26/2010
Ramsey
>
Public
>
Agendas
>
Council
>
2010
>
Agenda - Council - 10/26/2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2025 2:47:16 PM
Creation date
10/21/2010 2:48:51 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
10/26/2010
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
213
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1. Approve the $29,200 contract amendment; at which point they would then prepare a revised <br />scope /contract amendment, to incorporate the required improvements to extend infrastructure to <br />the Legacy site, for future consideration. <br />2. Approve the $24,500 contract amendment; at which point they would then prepare a revised <br />scope /contract amendment, to incorporate the required improvements to extend infrastructure to <br />the Legacy site, for future consideration. This reduced amount would entail the same work as <br />option 1, but would remove their profit margin. <br />3. Agree to pay them $10,625.46, for work completed to date, at which point we would have to <br />complete the project on our own. <br />This item was discussed by the Public Works Committee on October 19, 2010, and it was their <br />recommendation to pay the consultant what was due, $10,625.46, and prepare a Request for Proposals <br />(RFP) to complete the existing plan to construction documents, including the infrastructure <br />improvements that are determined as a result of the feasibility study currently underway for the Legacy <br />Christian Academy project. Typically Council entertains the items advanced by the Public Works <br />Committee at the first regular meeting the month following the Committee meeting (November 9, 2010), <br />but due to the tight timeline for completion and advancement of this project staff is requesting Council <br />to review this matter and provide direction at this time. <br />Funding Source: <br />Drafting, distribution, and review of the RFP will be conducted by City staff. Implementation of this <br />project is part of the Ramsey Town Center Regional Roadway Improvements and was included in the <br />CIP, with GO Bonding identified as the funding source. These improvements are now included in the <br />Town Center dashboard with reimbursements to come from future land sales, and now potentially TIF. <br />Staff Recommendation: <br />Staff recommends authorization to prepare and distribute an RFP for engineering services to complete the final <br />plans and specifications for Improvement Project #06 -20, and incorporate any improvements that come about <br />as part of the on -going feasibility study for the Legacy Christian Academy. <br />Council Action: <br />Motion to approve the preparation and distribution of an RFP for engineering services to complete the final <br />plans and specifications for Improvement Project #06 -20, and incorporate any improvements that come about <br />as part of the on -going feasibility study for the Legacy Christian Academy. <br />Attachments: <br />TKDA letter and invoice <br />Reviewed by: <br />City Administrator <br />Public Works Direc .r /Principal City Engineer <br />CC: 10/26/10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.