My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 05/28/2002
Ramsey
>
Public
>
Agendas
>
Council
>
2002
>
Agenda - Council - 05/28/2002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2025 11:08:01 AM
Creation date
9/2/2003 3:15:34 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
05/28/2002
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
323
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Tree Preservation. The prelhninary plat is providing for tree save areas. Tree prese~/ation <br />me,ods will be ~unher addressed duv'mg inal plat review. The addition of one 2.5 tach dbh <br />tree to the ~i'ont of each lot has been provided in accordance with Cie/standards. <br /> <br />10. Sidewalk3. Tnt pretirmnary pla[ [s providing for an ei,,~hr foot bitum/nous path along rod/ne <br /> Street instead of a five foot sidewalk, the Proposed bituminous trail [s acceptable. <br /> <br />[1. Trail Development: T'ae Park Commission recommended that the Developer work with <br /> S ~a~~ regarding the exact [ocmion of die bituminous trail through be development. <br /> <br />12. <br /> <br />Sound ~htigadon: Tnt C",r7 has engaged the serdces of SP,.F Consulting firm to review <br />sound mitigation me~ures that may be required in order to comply wi~ MPCA's noise level <br />standards along State Highway ~f47. SRY concluded that &e subject prope~/is far <br />away fi:om Hi,,~atway ~47 that sound m/rigation measures are not necessap/. <br /> <br />Tat cost of the sound mitigation study is $2,000 dollars and will be char~ed to the applicant's <br />responsibiliq/escrow account. <br /> <br />Stormwater Management: Tnt Cio/ has established a storm ,mater management fee that <br />must be paid prior ro release of the fSnal plat for record./ng. The current rate is $375 per lot. <br /> <br />14. Park Dedication: The Park Commission recommended that park dedication be ~liSIled by a <br /> cash payment consisting of 22,100.00 dollars (13 x $1,700.00). <br /> <br />[5. <br /> <br />Trail Deveh)pment Fees: The City has established a trail development of $400.00 per <br /> ~,_,00.03 do[lar~ will be required prior recording <br />residential lot, in this case a cash payment of '" ~ <br />of the ~Lnal plat ( [ ] x '~00.00 dollars). <br /> <br />16. <br /> <br />Final Plat: Since the development of Wildlife Sanctuar7 3~ Addition [s contingent upon the <br />development time ~ame of Wildlife Sanctuary 2''a Addition; final Plaz for Wildlife Sanctum? <br />3~a Addition will need to be done m conjunction with Wildlife Sanctuary 2'~a Addition. <br />Construction of Md/ne Street and development of d~e lots cannot commence until <br />construction of iodine Street located in Wildlife Sancruac~ 2"a Addition has been completed. <br /> <br />The City Council will be meeting at 7:00 p.m. on Tuesday, May 2§, 2002 ar the Ramsey Fire <br />Star/on bro. 2, [5050 ,dxxnstrong. B[¥d. NW, to review your preliminary plat. A copy of tko case <br />cover sheer is enclosed. <br /> <br />Respectfully, <br /> <br /> Olson <br />Principal Cit7 Engineer <br /> <br />-201 - <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.