Laserfiche WebLink
-200- <br /> <br />~amh b~m [cad. All ~ipes under roads and p~i~g ~as musz maintain a <br />I~e~ of cover over the mp or,he pipe. <br /> <br />The pond and outlet must be consmacted and protected during Phase [ and be~bre any <br />oanmn, consmacrion activi~/takes pla ,~. <br /> <br />A fm~ ~ading plan must be subrmtzed as parz of the ~dnal plat. Items to be included on the <br />l;ma[ omde plan are as ~.%llows: <br /> <br />a. Storm sewer size, Wpe, inve,~s ant :o1: of casting <br />b. Comer lot elevations <br />c. Critical drama,~ swaie ~d ~ ~ <br /> OVe,~OW <br /> ~ ~ ,,me, ~.,,cy elevations <br /> d. Drainage ~d u~iliq/e~emenrs <br /> e. House s~/~e wk~ demii ~d rag[e ~ar ~c[udes home 7/po, iow floor elevation, <br /> ~toor elevation, lowest opening efeuafion, [00-7e~ flood elevation, s=eer center <br /> e[evariom, and ~oar ~d re~ y~d slopes. <br /> Detail of aprons (CIca 2I reqmred) <br /> Ho~e e[evatio~ lO0 ~bot e=or <br />h. ~m eievarion oa Outlet conxol s~cmre derail is <br /> Derail of house <br />j. Coord~ation with W[tdlkb <br /> = tbr sro~ sewer <br /> <br />Ea~ement~. Tae st~dard [0 toot drainage and utility easements (5 feet on common pro.pert7 <br />lines) have' <br /> r:e,,n provided around the pemmerer o'f all. All wetlands on ~he property must be <br />delineated -and dedicated as drainage and atili~'/easements. A 20 ~bot easement is required <br />over all storm sewer pipes. <br /> <br />Utilities. -Uae de,/elo.pmenr wilt be served by municipal 'water and sanitap/sewer. Options for <br />service -are: a) developer extend sewer Immk and any costs incurred above and beyond the <br />sewer -and wa[er trunk fees due would be the responsibility, of the developer; b) the developer <br />can wait ~br the interceptor; c) developer can work om: a Lift station plan with surrounding <br />developments that could be vacated when the interceptor ger~ to the area. <br /> <br />Cae Developer has opted to plan for a Eft station thac would be deep enough, to serve all ibur <br />developments (Wildlife Sancmav/? and 3~, Ever~een Point, and Sunflower P, hdge). This <br />iii5 station has been proposed to be located on the north side of an adjacent pint. if one of ~e <br />above mentioned p~ars does not get approvaL, the plan will need to be modified. There needs <br />ro be an easement large enough ([00 fi) to accommodate the interceptor when it gets to the <br />area, Al1 utilities must be extended to the end of the plat on all stub streets. <br /> <br />The Ckv, charxes~ $_,oz. O0¢'" ' dollars per iot ibr sewer trunk char~es, and II,252.00 per <br />residential lot ~br ,,rarer [rumc charges. These fees must be paid prior to recording the p~ar. <br /> <br />! <br />I <br /> <br />I' <br />I <br />I' <br />I <br /> <br /> I <br />I <br /> I <br /> I <br /> I <br /> <br /> <br />