Laserfiche WebLink
DRAINAGE IMPROVEMENTS <br />ITEM <br />APPROX. <br />NO. <br />ITEM <br />QUANTITY <br />UNIT <br />UNIT PRICE <br />AMOUNT <br />1 <br />MOBILIZATION <br />1 <br />LS <br />$ <br />2,500.00 <br />$ <br />2,500.00 <br />2 <br />15" PIPE SEWER <br />360 <br />LIN FT <br />$ <br />22.00 <br />$ <br />7,920.00 <br />3 <br />18" PIPE SEWER <br />0 <br />LIN FT <br />$ <br />25.00 <br />$ <br />- <br />4 <br />24" PIPE SEWER <br />0 <br />LIN FT <br />$ <br />30.00 <br />$ <br />5 <br />30" PIPE SEWER <br />0 <br />LIN FT <br />$ <br />48.00 <br />$ <br />6 <br />36" PIPE SEWER <br />0 <br />LIN FT <br />$ <br />60.00 <br />$ <br />7 <br />36" PIPE SEWER APRON <br />0 <br />EACH <br />$ <br />1,200.00 <br />$ <br />- <br />8 <br />CONST DRAINAGE STRUCTURE 2'X3' <br />12 <br />EACH <br />$ <br />950.00 <br />$ <br />11,400.00 <br />9 <br />CONST DRAINAGE STRUCTURE 48" <br />0 <br />EACH <br />$ <br />1,600.00 <br />$ <br />- <br />10 <br />CONST DRAINAGE STRUCTURE 60" <br />0 <br />EACH <br />$ <br />2,400.00 <br />$ <br />11 <br />CONST DRAINAGE STRUCTURE 72" <br />0 <br />EACH <br />$ <br />3,200.00 <br />$ <br />- <br />12 <br />CASTING ASSEMBLY <br />12 <br />EACH <br />$ <br />475.00 <br />$ <br />5,700.00 <br />13 <br />RIPRAP AT PIPE OUTLET <br />0 <br />CU YD <br />$ <br />120.00 <br />$ <br />- <br />SUBTOTAL <br />$ <br />27,520.00 <br />CONTINGENCIES (10%) <br />$ <br />2,752.00 <br />TOTAL <br />$ <br />30,272.00 <br />ENGINEERING, CONSTRUCTION STAKING & ADMIN. (18%) <br />$ <br />5,448.96 <br />SUBTOTAL DRAINAGE <br />$ <br />35,720.96 <br />GRAND TOTAL ROADWAY AND STORM SEWER $ 826,082.90 <br />