Laserfiche WebLink
-140- <br /> <br />14. <br /> <br />15. <br /> <br />16. <br /> <br />17. <br /> <br />18. <br /> <br />Street lights (5 ~ $1700/each) $8,500.00 <br />Street light maintenance & operation for 3 years (5 x$270) $1,350.00 <br />Street sweeping $300.00 <br />Sealcoating $2,000.00 <br /> <br />TOTAL $12,390.00 <br /> <br />Hard Surfaced Driveways. Hard surfaced (bituminous or concrete) driveways are a <br />requirement for each unit in the Plat. Said improvement shall be installed by the building <br />permit applicant at the time the Certificate of Occupancy is issued or as soon thereafter as <br />possible, weather permitting. In the event this improvement is not timely installed on a <br />unit, the DEVELOPER and/or the DEVELOPER'S assign(s), agree that the CITY may <br />install said improvement on the unit and specially assess the cost. The DEVELOPER <br />hereby waives ali right-to a public hearing and other statutory rights or City Charter rights <br />granted a property owner relating to special assessments, including the right to appeal the <br />special assessment for installation of the hard surfaced driveway. In addition, the <br />DEVELOPER grants the CITY a license to enter the Plat in order to install the <br />improvement described in this paragraph if the same has not been previously constructed. <br /> <br />Boulevard and Area Restoration. The DEVELOPER shall be responsible for the cost <br />of establishing seed in all boulevards within thirty (30) days of the completion of the <br />street improvements, and restoring all other areas disturbed by the development grading <br />operation in accordance with the approved erosion and sediment control plan. The <br />DEVELOPER shall also be responsible for the cost of cleaning any soil, earth or debris <br />from the wetlands within and adjacent to this Plat resulting from grading performed in the <br />development of the land. <br /> <br />Street Cleaning. After the street surfacing is installed, the DEVELOPER shall clear any <br />soil, earth, or debris from the streets within the Plat resulting from any construction <br />within the Plat by the DEVELOPER or its successors and assigns. From time to time, <br />the CITY may remove accumulations of soil, earth and debris from the streets, resulting <br />from the construction of the Plat. It shall be the DEVELOPER'S responsibility to pay <br />the costs associated with this necessary street cleaning. Invoices from the CITY to the <br />DEVELOPER for such costs shall be paid within fifteen (15) days of the date of invoice. <br /> <br />Private Streets and On-Street Parking. On-street parking shall be prohibited on <br />private streets. Further, said on-street parking regulations shall be signed and said <br />signing shall be subject to the approval of the CITY. At no time will the private streets be <br />maintained or accepted for ownership by the CITY. These items shall be clearly stated in <br />the covenants drafted as part of the homeowners association. The association documents <br />shall include appropriate enforcement provisions. <br /> <br />Private Street Cleaning. In the event the CITY determines that the private streets and <br />driveway collectors are contributing to the increased sedimentation of the ponds that the <br />CITY is required to maintain, the CITY shall provide the homeowner's association with <br />thirty (30) days written notice to sweep the streets. If the association fails to comply <br />within the thirty. (30) day time frame, the CITY or its contractor will sweep the streets <br /> <br />I <br /> <br /> <br />