Laserfiche WebLink
I <br />I <br />i <br /> I <br />I <br /> I <br />-I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> i <br /> I <br /> I <br /> <br /> '- SUWIMARY OF PRO0'ECT 6: <br />SUNFISH LAKE BLVI) (tLa, MSEY) TO ROUND LAKE BLVD (COON tL~.PIDS) <br /> <br /> DESCRIPTIVE ISSUES <br />Project Convert to 6-lane Freeway. Includes the conversion of the Ferry St <br />Description Interchange into an overpass. (See Figure 5.3-6A & 5.3-6B) <br />Connectivity For this project, a frontage road system would be completed along with an <br /> overpass on Tiff 10 to improve local circulation. <br />I Social', Realignment changes and new interchanges will require the purchase of right- <br />Environmental, of-way in an urbanized area. Property that is currently being used as a public <br />and Economik golf course would be required to complete this project. Anoka is considering <br />impacts relocating this golf course. <br /> Project likely to require an EIS (state or federal') <br />Local Actions The Cities of Ramsey, Anoka, and Coon Rapids should work with Mn/DOT <br />Needed to refine the project design concept and incorporate this concept into their <br /> local comprehensive plans. An official' map of the project concept should also <br /> be considered. For the interchanges, an interchange area management plan <br /> should be developed to identify appropriate land uses and land use controls <br /> ~br areas adjacent to each interchange. <br />Right-of'~Way As mentioned above, realignment changes and new interchanges will require <br />Needs the purchase of right-of-way in an urbanized area. Property, that is currently <br /> being used as a public golf course would be required to complete this project. <br /> Anoka is considering relocating this golf course. <br />Deliverability Design complete? N__q <br /> Funding designated or programmed? N__9.o <br /> Environmental documentation complete? N__2 <br /> Project Funding Category.: Categ0rv 2 (Needed- to achieve both the <br /> speed -and mobility objectives) <br />Multi-Corridor This project could result in a diversion Of trips away from ][-94 and, to a lesser <br />Benefit degree, TH 101/169. ' <br />Interim For this project, potential interim measures include 'frontage road construction <br />Measures and existing access consolidation. <br />Design This project would be a continuatiou of the 6/g-tune freeway project proposed <br />Continuity west of Round Lake Boulevard. · <br /> <br />TH I 0 IRC St~tdv <br /> <br />Corridor Management P/an 5-40 <br />No. 815260J <br /> <br />/clentification, Evaluation, and <br /> Selection of ,4lternatives <br /> <br />-427- <br /> <br /> <br />