Laserfiche WebLink
PROPOSAL <br />REQUEST <br /> <br />AIA DOCUMENT G709 <br /> <br />OWNER _X_ <br />ARCHITECT _X_ ~- <br />CONTRACTOR _X_ <br />FIELD <br />OTHER <br /> <br />THIS DOCUMENT HAS IMPORTANT LEGAL CONSEQUENCES; CONSULTATION WITH AN A'CrORNEY IS ENCOURAGED WITH RESPECT TO <br />ITS COMPLETION OR MODIFICATION. AUTHENTICATION OF THIS ELECTRONICALLY DRAFTED AIA DOCUMENT MAY aE MADE BY USING <br />AIA DOCUMENT D401. <br /> <br />PROJECT: <br /> <br />OWNER: <br /> <br />Renovation of the existing <br />Ramsey City Hall <br />15153 Nowthen Blvd. <br />Ramsey MN 55303 <br />City of Ramsey <br />15153 Nowthen Blvd. <br />Ramsey MN 55303 <br /> <br />PROPOSAL'REQUESTNO.:: <br />DATE OFISSUANCE: <br />.CONTRACT FOR: <br />CONTRACT DATED: <br /> <br />THREE (3) <br /> <br />August 12, 2002 <br /> <br />RemOdel of City Hall <br /> <br />June 19, 2002 <br /> <br />TO CONTRACTOR: <br /> <br />Braun Built Corporation <br />P.O. Box 1304 <br />Burnsville, MN 55337 <br /> <br />:ARCHITECT'S PROJECT#: <br />ARCHITECT <br /> <br />1272.03 <br /> <br />Boarman Kroos Vogel Group <br />222 N. 2nd Street <br />Minneapolis, MN 55401 <br /> <br />Please submit an itemized quotation for changes in the Contract Sum and Contract Time for proposed modifications to the <br />Contract Documents described herein. Submit proposal within (# of days) days, or notify Architect in writing of the date on <br />which you anticipate submitting your proposal. ': <br /> <br />THIS IS NOT A CHANGE ORDER, CONSTRUCTION DIRECTIVE OR A DIRECTION TO PROCEED WITH THE WORK <br />DESCRIBED IN THE PROPOSED MODIFICATIONS. <br /> <br />-80- <br /> <br />DESCRIPTION OF THE WORK: <br />Miscellaneous items requested by the owner to correct previous conditions. <br />ATTACHMENTS: None. <br />Architectural <br /> 1. Service Counter. (employee side) The left unit to have. V=" adjustable Shelving with dividers at the center, shelf depth £o be <br /> 18" max. Right unit, add two pencil draws approximately 2 V2" deep with. a3-4" front, match casework color and one ~A" full <br /> depth adjtmtable shelf. <br /> 2. Construct enclosures for relocated unit heaters on second floor to 42" finished height versus ~11 height walls. In~tall a 12" <br /> wide x length of wall P~lam top. P-lam to match upper service counter height and color. <br />Mechanical <br /> 1. On 2/M1.1, blank-off six existing zone 11,12 supply grilles, in walls on grids 5 and 6 while maintaining or restoring <br /> two active supply grilles immediately east of grid C. Do not remove existing VAV motorized dampers, Adjust <br /> dampers to limit flow at maximum stat signal to 200 cfm from each grille. Set VAV-2 maximumcfm to 600 cfm <br /> and adjust associated suppty diffusers.to 300 cfm each. Move existing zone 11, 12 thermostat to north face of <br /> column <br /> <br />2~ <br /> <br />4. <br />Electrical <br /> <br /> 1. Room 120: Change existing "Emergency Fixture" on.south wall to a combination Emergency/Exit light. <br /> Emergency to be connected to circuitry serving Room 120 and Exit shall be connected to. nearest Exit circuit. · <br /> Field verify exact conditions. <br />~F-QUESTED BY: OWNER I '/ <br /> <br />! <br />! <br /> <br />On 2./M1.1 ,move existing zone 2,3 thermostat from west wall of room 208 to west wall of room 209, near existing <br />light switch. I <br />On 2JM1.1 ,move existing zone 7,8 thermostat from west wall of room 204 to south wall' near room exit door, <br />On 2/Ml.l,move existing zone 9 thermostat from east wall of room 203 to south wall of near room south east exit <br />door. <br /> <br /> I <br />I <br />I <br /> <br /> <br />