My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 10/22/2002
Ramsey
>
Public
>
Agendas
>
Council
>
2002
>
Agenda - Council - 10/22/2002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2025 11:12:41 AM
Creation date
9/3/2003 9:12:32 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
10/22/2002
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
465
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Braun Built <br />Corporation <br /> <br />P,O. Box 1304 <br />Burnsville, MN 55337 <br /> <br />"What You Vision <br />We Build" <br /> <br />PROPOSAL <br /> <br />TO: BKV Group <br /> 222 N. Second Street <br /> Minneapolis, MN 55401 <br /> Attn: Jeff Sandnas <br /> <br />PROJECT: Ramsey City Hall <br /> address: 15153 Nowthen Blvd. <br /> Ramsey, MN 55303 <br /> <br />PROPOSAL REQUEST NO: 3B <br /> date: 9125/02 <br /> <br /> CONTRACT FOR: General Construction <br />CONTRACT DATE: June 19, 2002 <br /> OUR JOB NO: 235 <br /> <br />ARCHITCT'S PROJECT NO.: 1272.03 <br /> CONTRACT DATE: June 19, 2002 <br /> <br />We have been directed by the owner & architect to perform the following items per the proposal request <br />dated 8/12/02 & per items as discussed during the weekly meetings: <br /> <br />1. (Mechanical) F&I and paint (2) 12" radiator cover extensions (due to wall demo). <br /> <br />$100.00 <br /> <br />2. (Electrical) F&I (1) additional circuit for 2nd floor lighting. <br /> <br />3. (Electrical) Trace & repair the multiple A-phase circuit breakers in panel L2 that were sharing <br /> the same neutrals. These circuits needed to be brought up to code. <br /> <br />$696.00 <br />$742.00 <br /> <br />4. (Electrical) F&I (1) dedicated circuit for plotter. <br /> <br />5. (Electrical) F&I (2) outlets/wiremold for 2nd floor cubicles. <br /> <br />$368.00 <br />$635.00 <br /> <br />6. (Electrical) F & I (1) duplex outlet in new wall by backstairs for coffee pot. <br /> <br />$368.00 <br /> <br />7. Relocate dumpster to back field due to city activities. <br /> <br />8. Add'l cost for carpet take-up & removal due to non-standard conditions. (100 add'l hrs) <br /> <br /> $110.00 <br />$2,750.00 <br /> <br />9. Provide (2) temporary outlets @ front service counter whip locations, <br /> <br />$110.00 <br /> <br />10. Fill numerous existing communication & electrical holes in floor exposed dudng carpet demo. <br /> <br />$165.00 <br /> <br />11. Touchup paint the existing exposed ductwork. <br /> .'' <br /> <br />Lee K. Braun <br />President <br />Braun Built Corporation <br /> <br />Total Amount: <br /> <br /> Accepted by: <br /> <br /> $75.00 <br />$6,119.00 <br /> <br />Signature date <br /> <br />Business 952-461 -.~gSo <br /> <br />brc unbuiitcorp@inte,cjraonline.co ;q <br /> <br />Fox 952-461,~7%~58 <br /> <br />Genera/ Contracting · Construct/on Management · Tenant Improvements <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.